[Federal Register: May 27, 1999 (Volume 64, Number 102)] [Notices] [Page 28814] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr27my99-56] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP99-524-000] Natural Gas Pipeline Company of America; Notice of Application May 21, 1999. Take notice that on May 18, 1999, Natural Gas Pipeline Company of America (Natural), 747 East 22nd Street, Lombard, Illinois 60148 filed an application with the Commission in Docket No. CP99-524-000 pursuant to section 7(b) of the Natural Gas Act (NGA) for permission and approval to abandon by sale to MidCon Texas Pipeline Operator, Inc. (MidCon Texas), an affiliated intrastate pipeline, various contiguous facilities located in Arkansas and Refugio Counties, Texas, and authorized in Docket Nos. G-19086, as amended in Docket No. CP61-111, CP66-96, CP76-493, CP80-86, CP82-402-000, and CP85-519-000, all as more fully set forth in the application which is open to the public for inspection. This filing may be viewed on the web at http:www.ferc.fed.us/online/rims.htm (call 202-208-2222 for assistance). Natural proposes to abandon its contiguous St. Charles, Zoller, Fulton Beach, and Nine Mile Point laterals and related meter, tap, and appurtenant facilities located in Arkansas and Refugio Counties. Natural states that these facilities were originally constructed as a means of receiving gas purchased from various producers for Natural's system supply to support Natural's merchant function. Natural's merchant function terminated effective December 1, 1993. Consequently, Natural states that it no longer needs the said facilities to receive its own gas supply and no longer has any gas purchase obligations regarding these facilities. Moreover, Natural states that the transportation value to Natural of the above facilities has been greatly reduced. Natural proposes to abandon a total of approximately 52 miles of pipeline laterals and related meter, tap, and appurtenant facilities. Natural states that it proposes to transfer these facilities to MidCon Texas for their cumulative net book value as of the closing date specified in its assets sale agreement with MidCon Texas. Any person desiring to be heard or to make any protest with reference to said application should on or before June 11, 1999, file with the Federal Energy Regulatory commission, Washington, DC 20426, a motion to intervene or a protest in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the NGA (18 CFR 157.10). All protests filed with the Commission will be considered by it in determining the appropriate action to be taken but will not serve to make the protestants parties to the proceeding. Any person wishing to become a party to a proceeding or to participate as a party in any hearing therein must file a motion to intervene in accordance with the Commission's Rules. Take further notice that, pursuant to the authority contained in and subject to the jurisdiction conferred upon the Federal Energy Regulatory Commission by sections 7 and 15 of the NGA and the Commission's Rules of Practice and Procedure, a hearing will be held without further notice before the Commission or its designee on this application if no motion to intervene is filed within the time required herein, if the Commission on its own review of the matter finds that permission and approval for the proposed abandonment are required by the public convenience and necessity. If a motion for leave to intervene is timely filed, or if the Commission on its own motion believes that a formal hearing is required, further notice of such hearing will be duly given. Under the procedure herein provided for, unless otherwise advised, it will be unnecessary for Natural to appear or be represented at the hearing. David P. Boergers, Secretary. [FR Doc. 99-13461 Filed 5-26-99; 8:45 am] BILLING CODE 6717-01-M