[Federal Register: May 27, 1999 (Volume 64, Number 102)] [Notices] [Page 28811-28812] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr27my99-49] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP98-256-002] Columbia Gulf Transmission Company; Notice of Extension of Time and Waiver Request May 21, 1999. Take notice that on April 1, 1999, Columbia Gulf Transmission Company (Columbia Gulf), in compliance with the Commission's order issued December 17, 1998,\1\ in Docket No. RM96-1-012, tendered for filing a report detailing its level of compliance with Section 284.10(c)(2)(i) of the Commission's Regulations.\2\ This section, adopted by the Commission in Order No. 587-G, requires each interstate pipeline to enter into operational balancing agreements (OBAs) at all points of interconnection between its system and the system of another interstate or intrastate pipeline by April 1, 1999.\3\ --------------------------------------------------------------------------- \1\ Standards For Business Practices of Interstate Natural Gas Pipelines, 85 FERC para. 61,371 (1998). \2\ 18 CFR 284.10(c)(2)(i). \3\ Standards For Business Practices of Interstate Natural Gas Pipelines, Order No. 587-G, 63 FR 20072 (Apr. 23, 1998), III FERC Stats. & Regs. Regulations Preambles para. 31,062 (Apr. 16, 1998). --------------------------------------------------------------------------- Extension of Time Columbia Gulf requests an extension of time, until July 1, 1999, to conclude OBA negotiations with three interconnecting systems. In addition, Columbia Gulf seeks either an extension of time to comply with, or a waiver of the requirements of Section 284.10(c)(2)(i) with respect to Columbia Gulf's ownership interest in the Central Texas Loop facility. Upon consideration, notice is hereby given that Columbia Gulf is granted a further extension of time to comply with section 284.10(c)(2)(i) of the Commission's regulations until no later than June 30, 1999. On or before June 30, 1999, Columbia Gulf must file a statement indicating whether it is in compliance with section 284.10(c)(2)(i) of the Commission's Regulations. Waiver Request Columbia Gulf also seeks a waiver of the requirements of Section 284.10(c)(2)(i) for the following types of [[Page 28812]] interconnects: (a) Columbia Gulf's offshore sub-sea interconnections [small offshore lines that run from an offshore natural gas production platform to a sub-sea interconnection with another pipeline]; and (b) Columbia Gulf's small offsystem-onshore pipelines [small lines that run from an onshore natural gas production well to an interconnection with another pipeline downstream of the meter]. Any person desiring to be heard or to protest Columbia Gulf's request for waiver should file a motion to intervene or a protest with the Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426, in accordance with sections 385.214 or 385.211 of the Commission's Rules and Regulations. All such motions or protests must be filed in accordance with section 154.210 of the Commission's Regulations. Protests will be considered by the Commission in determining the appropriate action to be taken, but will not serve to make protestants parties to the proceedings. Any person wishing to become a party must file a motion to intervene. Copies of Columbia Gulf's report are on file with the Commission and are available for public inspection in the Public Reference Room. This filing may be viewed on the web at http://www/ferc/fed/us/online/ rims.htm (call 202-208-2222 for assistance). David P. Boergers, Secretary. [FR Doc. 99-13460 Filed 5-26-99; 8:45 am] BILLING CODE 6717-01-M