[Federal Register: May 5, 1999 (Volume 64, Number 86)] [Notices] [Page 24213-24214] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr05my99-106] ----------------------------------------------------------------------- DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Lafourche Parish, Louisiana agency: Federal Highway Administration (FHWA), DOT. action: Notice of intent. ----------------------------------------------------------------------- summary: The FHWA is issuing this notice to advise the public that an Environmental Impact Statement will be prepared for a proposed highway project in Lafourche Parish, Louisiana. for further information contact: William C. Farr, Program Operations [[Page 24214]] Manager, Federal Highway Administration, P.O. Box 3929 (Room 255), Baton Rouge, Louisiana, 70821, Telephone: (225) 389-0465, Facsimile: (225) 389-0758. supplementary information: The FHWA, in cooperation with the Louisiana Department of Transportation and Development (LDOTD), will prepare an Environmental Impact Statement (EIS) on a proposal to construct a new highway facility on current or new alignment. The proposed project, known locally as the LA 1 Improvements from Golden Meadow to Port Fourchon, is generally located in the present LA 1 corridor from Golden Meadow, Louisiana to Port Fourchon, Louisiana. The roadway includes several alternates based on the number of navigable bridges needed for various alignments. The approximate length of the project is 29 kilometers (18 miles). The proposed improvements would improve the capacity, reliability, and safety of the existing LA 1 and increase regional access to Port Fourchon for persons, businesses and industry in the region. It is a part of the National Highway System and would improve access to the vitally important deep-water port of Port Fourchon on the coast of Louisiana. The northern terminus of the proposed project will be the southern end of route LA 3235 and the southern terminus will be Port Fourchon. Alternatives to be considered are: (1) The ``Do-nothing'' Alternative, where the current and existing LA 1 is repaired and maintained in its present location, capacity, and character. (2) The ``Build'' Alternative, considering several different alignments, roadway type and control of access. An agency scoping meeting will be held at a time and place to be determined at a later date. Letters describing the proposed action and soliciting comments will be sent to appropriate Federal, state, and local agencies and to private organizations, including conservation groups and groups of individuals who have expressed interest in the project in the past. At least one public informational meeting will be held in the project area that will be affected. In addition, a Public Hearing will be held. Public notice will be given of the time and place of the public informational meeting(s) and the Public Hearing. The draft EIS will be available for public and agency review and comment prior to the Public Hearing. To ensure that the full range of issues related to this proposed action are addressed, and all significant issues identified, comments and suggestions are invited from all interested parties. Comments or questions concerning this proposed action and the EIS should be directed to the FHWA at the address provided above. (Catalog of Federal Domestic Assistance Program Number 20.205, Highway Planning and Construction. The regulations implementing Executive Order 12372 regarding intergovernmental consultation on Federal programs and activities apply to this program.) Issued on April 28, 1999. William A. Sussmann, Division Administrator, FHWA, Baton Rouge, Louisiana. [FR Doc 99-11227 Filed 5-4-99; 8:45 am] BILLING CODE 4910-22-M