[Federal Register: January 14, 1999 (Volume 64, Number 9)] [Notices] [Page 2486] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr14ja99-60] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Intent To File an Application for a New License January 8, 1999. a. Type of Filing: Notice of Intent to File An Application for a New License. b. Project No.: 5334. c. Date Filed: December 21, 1998. d. Submitted By: Charter Township of Ypsilanti--current licensee. e. Name of Project: Ford Lake Hydroelectric Project. f. Location: On the Huron River in the Charter Township of Ypsilanti, in Washtenaw County, Michigan. g. Filed Pursuant to: Section 15 of the Federal Power Act. h. Licensee Contact: Charter Township of Ypsilanti, 7200 S. Huron River Drive, Ypsilanti, MI 48197, Joann Brinker, (734) 484-0065. i. FERC Contact: Any questions on this notice should be addressed to Tom Dean, E-mail address, thomas.dean@ferc.fed.us, or telephone (202) 219-2778. j. Effective date of current license: April 1, 1962. k. Expiration date of current license: September 30, 2003. l. Description of the Project: The project consists of the following existing facilities: (1) a 45-foot-high earth embankment with a 172-foot-long concrete spillway; (2) a 987-acre reservoir at normal pool elevation of 684.6 feet msl; (3) a powerhouse containing two generating units with a total installed capacity of 2,400 kW; (4) an electrical substation; and (5) other appurtenances. m. Each application for a new license and any competing license applications must be filed with the Commission at least 24 months prior to the expiration of the existing license. All applications for license for this project must be filed by September 30, 2001. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 99-786 Filed 1-13-99; 8:45 am] BILLING CODE 6717-01-M