[Federal Register: August 13, 1999 (Volume 64, Number 156)] [Notices] [Page 44216-44217] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr13au99-69] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted for Filing and Request for Motions To Intervene and Protests August 9, 1999. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. This is a reissuance of the notice issued on January 28, 1999. a. Type of Application: Preliminary Permit b. Project No.: P-11653-000. c. Date filed: December 28, 1998, and revised on March 26, 1999. d. Applicant: Universal Electric Power Corp. e. Name of Project: Muskingum L&D #10 Hydroelectric Project. f. Location: At the existing Muskingum Lock and Dam #10, which is owned by the Ohio Department of Natural Resources, Division of Parks and Recreation, on the Muskingum River, near the Town of Zanesville, Muskingum County, Ohio. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(i). h. Applicant Contact: Mr. Ronald S. Feltenberger, Universal Electric Power Corp., 1145 Highbrook Street, Akron, Ohio 44301, (330) 535-7115. i. FERC Contact: Susan Tseng (202) 219-2798 or E-mail address at susan.tseng@FERC.fed.us. j. Comment Date: 30 days from the issuance date of this notice. k. Description of Project: The proposed project would consist of the following facilities: (1) the existing Muskingum Lock and Dam #10, with a storage of 3,410-acre-feet and a surface area of 470 acres at an upstream pool elevation of 687.55 feet m.s.1.; (2) a powerhouse downstream of the dam having an installed capacity of 4,000 kilowatts; (2) a new transmission line; and (3) appurtenant facilities. The proposed average annual generation is estimated to be 26 gigawatt hours. The cost of the studies under the permit will not exceed $1,750,000. l. Available Locations of Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference and Files Maintenance Branch, located at 888 First, Street, N.E., Room 2-A, Washington, D.C. 20426, or by calling (202) 219-1371. A copy is also available for inspection and reproduction at Universal Electric Power Corp., Mr. Ronald S. Feltenberger 1145 Highbrook [[Page 44217]] Street, Akron, Ohio 44301, (330) 535-7115. A copy of the application may also be viewed or printed by accessing the Commission's website on the Internet at www.ferc.fed.us. For assistance, users may call (202) 208-2222. Preliminary Permit--Anyone desiring to file a competing application for preliminary permit for a proposed project must submit the competing application itself, or a notice of intent to file such an application, to the Commission on or before the specified comment date for the particular application (see 18 CFR 4.36). Submission of a timely notice of intent allows an interested person to file the competing preliminary permit application no later than 30 days after the specified comment date for the particular application. A competing preliminary permit application must conform with 18 CFR 4.30(b) and 4.36. Preliminary Permit--Any qualified development application desiring to file a competing development application must submit to the Commission, on or before a specified comment date for the particular application, either a competing development application or a notice of intent to file such an application. Submission of a timely notice of intent to file a development application allows an interested person to file the competing application no later than 120 days after the specified comment date for the particular application. A competing license application must conform with 18 CFR 4.30(b) and 4.36. Notice of intent--A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice. Proposed Scope of Studies under Permit--A preliminary permit, if issued, does not authorize construction. The term of the proposed preliminary permit would be 36-months. The work proposed under the preliminary permit would include economic analysis, preparation of preliminary engineering plans, and a study of environmental impacts. Based on the results of these studies, the Applicant would decide whether to proceed with the preparation of a development application to construct and operate the project. Comments, Protests, or Motions to Intervene--Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protest, or motions to intervene must be received on or before the specified comment date of the particular application. Filing and Service of Responsive Documents--Any filings must bear in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT TO FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'', ``PROTEST'', ``MOTION TO INTERVENE'', as applicable, and the Project Number of the particular application to which the filing refers. Any of the above- named documents must be filed by providing the original and the number of copies provided by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426. An additional copy must be sent to Director, Division of Project Review, Federal Energy Regulatory Commission, at the above-mentioned address. A copy of any notice of intent, competing application or motion to intervene must also be served upon each representative of the Applicant specified in the particular application. Agency Comments--Federal, state, and local agencies are invited to file comments on the described application. A copy of the application may be obtained by agencies directly from the Applicant. If an agency does not file comments within the time specified for filing comments, it will be presumed to have no comments. One copy of an agency's comments must also be sent to the Applicant's representatives. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 99-20986 Filed 8-12-99; 8:45 am] BILLING CODE 6717-01-M