[Federal Register: January 25, 1999 (Volume 64, Number 15)] [Notices] [Page 3691-3692] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr25ja99-51] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP99-151-000] ANR Pipeline Company; Notice of Application January 19, 1999. Take notice that on January 12, 1999, ANR Pipeline Company (ANR), 500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No. CP99-151-000 an application pursuant to Section 7(c) of the Commission's Regulations under the Natural Gas Act for authorization associated with a pipeline replacement project in Porter County, Indiana, all as more fully set forth in the request which is on file with the Commission and open to public inspection. ANR proposes to use temporary work space and limited additional right-of-way to perform the replacement of 1.63 mile segments of both its 22-inch main line and 30-inch loop line with heavier wall pipe to continue to meet the DOT safety requirements in the affected area of Porter County, Indiana. ANR states that the replacement will not alter the associated pipeline's capacity, and that there will be no interruptions of service as a result of the replacement project because ANR will be able to flow volumes through parallel facilities. It is also stated that the cost of the project including the replacement performed under Section 2.55(b) of the regulations is about $4,494,000. Any person desiring to be heard or to make any protest with reference to said application should on or before February 9, 1999, file with the Federal Energy Regulatory Commission, Washington, DC 20426, a motion to intervene or a protest in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the Natural Gas Act (18 CFR 157.10). All protests filed with the Commission will be considered by it in determining the appropriate action to be taken but will not serve to make the protestants parties to the proceeding. Any person wishing to become a party to a proceeding or to participate as a party in any hearing therein must file a motion to intervene in accordance with the Commission's Rules. Take further notice that, pursuant to the authority contained in and subject to the jurisdiction conferred upon the Federal Energy Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and the Commission's Rules of [[Page 3692]] Practice and Procedure, a hearing will be held without further notice before the Commission or its designee on this application if no motion to intervene is filed within the time required herein, if the Commission on its own review of the matter finds that permission and approval for the proposed abandonment are required by the public convenience and necessity. If a motion for leave to intervene is timely filed, or if the Commission on its own motion believes that a formal hearing is required, further notice of such hearing will be duly given. Under the procedure herein provided for, unless otherwise advised, it will be unnecessary for ANR to appear or be represented at the hearing. David P. Boergers, Secretary. [FR Doc. 99-1539 Filed 1-22-99; 8:45 am] BILLING CODE 6717-01-M