[Federal Register: January 25, 1999 (Volume 64, Number 15)] [Notices] [Page 3692] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr25ja99-53] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. GP99-150-000] NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization January 19, 1999. Take notice that on January 12, 1999, NorAm Gas Transmission Company (NGT), 1111 Louisiana, Houston, Texas 77002-5231, filed in Docket No. CP99-150-000 a request pursuant to Sections 157.205 157.212 and 157.216 of the Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 157.212 and 157.216) for authorization to abandon, construct, and operate certain facilities in Arkansas under NGT's blanket certificate issued in Docket No. CP82-384-000 and CP82-384-001 pursuant to Section 7 of the Natural Gas Act, all as more fully set forth in the request that is on file with the Commission and open to public inspection NGT specifically requests authority to (1) abandon a 6-inch tap and relocate the existing skid mounted meter station located on Line LM-2 to a new location on Line BT-1; and (2) construct and operate a 2-inch tap on Line BT-1 and 380 feet of 4-inch diameter pipe (line BT-20) to continue to provide reliable service to Reynolds Metals Company (Reynolds). The estimated volumes to be delivered to this tap are approximately 442,000 Dth annually and 1,450 Dth on a peak day. The facilities will be constructed at an estimated cost of $6,700 and Reynolds will reimburse NGT all of the construction costs. Any person or the Commission's staff may, within 45 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefor, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the Natural Gas Act. David P. Boergers, Secretary. [FR Doc. 99-1538 Filed 1-22-99; 8:45 am] BILLING CODE 6717-01-M