[Federal Register: February 8, 1999 (Volume 64, Number 25)] [Notices] [Page 6063-6064] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr08fe99-65] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP99-169-000] ANR Pipeline Company; Notice of Request Under Blanket Authorization February 2, 1999. Take notice that on January 21, 1999, ANR Pipeline Company (ANR, 500 Renaissance Center, Detroit, Michigan 48243, filed pursuant to Sections 157.205 and 157.211 of the Commission's Regulations under the Natural Gas Act (18 CFR 157.205, 157.211) for authorization to construct and operate an interconnection between ANR and Associated Electric Cooperative, Inc. (AECI) in Nodaway County, Missouri, all as more fully set forth in the request that is on file with the Commission and open to public inspection. Specifically, ANR would construct and operate two 10-inch tap valve assemblies and osolating flanges, one each on ANR's 24-inch mainline and loopline; one 4-inch and one 6-inch turbine meter; a 2-inch positive displacement meter; an electronic measurement system; regulation and heater equipment; and approximately 400 feet of 10-inch pipe at an estimated cost of $659,000. ANR proposes to tie the proposed interconnection in with a 0.5-mile 10-inch line that AECI's would construct to connect to its power plant. ANR contends that the interconnection would provide a maximum daily volume of 57 Mmcf (through firm and interruptible services) to AECI's proposed power plant in Nodaway County. ANR indicates that these deliveries would be within the certificated entitlements of the customer. Any person or the Commission's staff may, within 45 days after issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and pursuant to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefor, the proposed activity shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for [[Page 6064]] authorization pursuant to Section 7 of the Natural Gas Act. David P. Boergers, Secretary. [FR Doc. 99-2921 Filed 2-5-99; 8:45 am] BILLING CODE 6717-01-M