[Federal Register: May 19, 1999 (Volume 64, Number 96)] [Rules and Regulations] [Page 27179] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr19my99-5] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF TRANSPORTATION Coast Guard 33 CFR Part 117 [CGD08-99-034] Drawbridge Operating Regulation; Gulf Intracoastal Waterway, TX AGENCY: Coast Guard, DOT. ACTION: Notice of temporary deviation from regulations. ----------------------------------------------------------------------- SUMMARY: The Commander, Eighth Coast Guard District has issued a temporary deviation from the regulation in 33 CFR 117.977 governing the operation of the Pelican Island Causeway bascule drawbridge across the Gulf Intracoastal Waterway, mile 356.1 at Galveston, Galveston County, Texas. This deviation allows the Galveston County Navigation District to maintain the bridge in the closed-to-navigation position from 7 a.m. until 7 p.m. from Monday, May 17, 1999, until Friday, June 4, 1999. Additionally, the bridge may remain in the closed-to-navigation position continuously from 7 a.m. on Thursday, May 20, 1999, until 7 p.m. on Sunday, May 23, 1999. At all other times, the bridge will operate normally for the passage of vessels. This temporary deviation is issued to allow for the replacement of the bridge fendering system. DATES: This deviation is effective from 7 a.m. on Monday, May 17, 1999, until 7 p.m. on Friday, June 4, 1999. FOR FURTHER INFORMATION CONTACT: Mr. David Frank, Bridge Administration Branch, Commander (ob), Eighth Coast Guard District, 501 Magazine Street, New Orleans, Louisiana 70130-3396, telephone number 504-589-2965. SUPPLEMENTARY INFORMATION: Navigation on the waterway consists of tugs with tows, fishing vessels, sailing vessels, and other recreational craft. The Galveston County Navigation District requested a temporary deviation from the normal operation of the bridge in order to accommodate the replacement of the fender system of the bridge. The fender system will be replaced in-kind. This deviation allows the draw of the Pelican Island Causeway bascule span drawbridge across the Gulf Intracoastal Waterway, mile 356.1 at Galveston, Galveston County, Texas, to remain in the closed- to-navigation position from 7 a.m. until 7 p.m. from Monday, May 17, 1999, until Friday, June 4, 1999. Additionally, the bridge may remain in the closed-to-navigation position continuously from 7 a.m. on Thursday, May 20, 1999, until 7 p.m. on Sunday, May 23, 1999. At all other times, the bridge will operate normally for the passage of vessels. Presently, the draw opens on signal for the passage of vessels; except that, from 7 a.m. to 8:30 a.m., 12 noon to 1 p.m., and 4:15 p.m. to 5:15 p.m. Monday through Friday, except Federal holidays, the draw need not open for the passage of vessels. Public vessels of the United States and vessels in distress shall be passed at any time. Dated: May 12, 1999. A. L. Gerfin, Jr., Captain, U.S. Coast Guard Commander, 8th Coast Guard Dist., Acting. [FR Doc. 99-12610 Filed 5-18-99; 8:45 am] BILLING CODE 4310-15-M