[Federal Register: May 19, 1999 (Volume 64, Number 96)] [Notices] [Page 27251] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr19my99-49] [[Page 27251]] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests May 13, 1999. Take notice the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Minor License. b. Project No.: P-11730-000. c. Date Filed: April 21, 1999. d. Applicant: Black River Limited Partnership. e. Name of Project: Alverno Hydroelectric Project. f. Location: On the Black River in the Townships of Aloha, Benton, and Grant, in Cheboygan County, Michigan. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Frank O. Christie, President, Franklin Hydro, Inc., 8 East Main Street, Malone, New York 12953, (518) 483-1961. i. FERC Contact: Any questions on this notice should be addressed to John Costello, E-mail address john.costello@ferc.fed.us (202) 219- 2914. j. Deadline for filing additional study requests: July 14, 1999. All documents (original and eight copies) should be filed with: David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official serve list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on the resource agency. k. Status of Environmental Analysis: This application is not ready for environmental analysis at this time. l. Description of Project: The constructed project consists of a 360-foot-long earth filled dam with a power plant located on the right riverbank and a gated spillway near the left bank. The project impoundment extends approximately 2.5 miles upstream. The powerhouse contains 2 horizontal turbine/generator sets. m. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference and Files and Maintenance Branch, located at 888 First Street, NE, Room 2A-1, Washington, DC 20426, or by calling (202) 208- 2326. A copy is also available for inspection and reproduction at the Cheboygan Public Library, 107 South Ball Street, Cheboygan, Michigan. n. With this notice, we are initiating consultation with the Michigan State Historic Preservation Officer (SHPO), as required by section 106, National Historic Preservation Act, and the regulations of the Advisory Council on Historic Preservation, 36 CFR 800.4. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 99-12567 Filed 5-18-99; 8:45 am] BILLING CODE 6717-01-M