[Federal Register: April 22, 1999 (Volume 64, Number 77)] [Notices] [Page 19853-19854] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr22ap99-129] ----------------------------------------------------------------------- DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environment Impact Statement: SR 20, Fredonia to 1-5, Skagit County, WA AGENCY: Federal Highway Administration (FHWA), DOT. [[Page 19854]] ACTION: Cancellation of notice of intent, FR document 91-15994. ----------------------------------------------------------------------- SUMMARY: The FHWA is issuing this notice to rescind the previous Notice of Intent issued on June 21, 1991, to prepare an environmental impact statement (EIS) for the proposed highway project in Skagit County, Washington. FOR FURTHER INFORMATION CONTACT: Gene K. Fong, Federal Highway Administration, Evergreen Plaza Building, Suite 501, 711 South Capitol Way, Olympia, Washington, 98501-1284, Telephone: (360) 753-9413; Brian Ziegler, State Design Engineer, Washington State Department of Transportation, Transportation Administration Building, Olympia, Washington, 98204, Telephone: (360) 705-7231; or, John Okamoto, WSDOT Northwest Region Administrator, 15700 Dayton Avenue North, PO Box 330310, Seattle, Washington 98133-9710, Telephone: (206) 440-4691. SUPPLEMENTARY INFORMATION: The FHWA, in cooperation with the Washington State Department of Transportation (WSDOT), issued a Notice of Intent on June 21, 1991 to prepare an EIS on a proposal to improve or construct a 4-1/2 mile section of SR 20 from two lanes to four lanes. The Draft Environmental Impact Statement (DEIS) was originally circulated on May 30, 1995, and was followed by an EIS/Design Hearing on June 28, 1995. Since then, as the project elements have been refined, impacts have been more specifically identified, and public and agency comments have been evaluated, the FHWA and WSDOT have jointly decided that the project will not result in significant impacts to the environment and that an Environmental Assessment (EA) is the most appropriate environmental document under the National Environmental Policy Act (NEPA) rather than an EIS. The EA is available through the above contacts. Because a previous hearing was held for this project, another hearing is not planned for the current EA. However, any person with questions about the project or wishing to request a hearing may write to Bill James at 15700 Dayton Avenue North, MS 11, PO. Box 330310, Seattle, WA. 98133-9710, or call (206) 440-4139. Authority: Catalog of Federal Domestic Assistance Program Number 20.205, Highway Research, Planning and Construction. The regulations implementing Executive Order 12372 regarding intergovernmental consultation of federal programs and activities apply to this program. Issued on: April 12, 1999. Donald A Petersen, Transportation and Environmental Engineer, Olympia, Washington. [FR Doc. 99-10110 Filed 4-21-99; 8:45 am] BILLING CODE 4910-22-M