[Federal Register: December 27, 1999 (Volume 64, Number 247)] [Notices] [Page 72340-72341] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr27de99-68] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests December 20, 1999. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: Original Minor License. b. Project No.: 11685-001. c. Date Filed: September 10, 1999. d. Applicant: The Stockport Mill Country Inn. e. Name of Project: Stockport Mill Country Inn Water Power Project. f. Location: On the Muskingum River Lock and Dam No. 6 near the town of Stockport, in Morgan County, Ohio. The project would not utilize federal lands. g. Filed Pursuant to: Federal Power Act, 16 USC 791(a)-825(r).. h. Applicant Contact: David Brown Kinloch, Soft Energy Associates, 414 South Wenzel Street, Louisville, KY 40204, (502) 589-0975. i. FERC Contact: Tom Dean, thomas.dean@ferc.fed.us (202) 219-2778. j. Deadline for Filing Motions To Intervene and Protests: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: David P. Boergers, Secretary Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Status on Environmental Analysis: This application is not ready for environmental analysis at this time. l. Description of the Project: The proposed project would consist of the following facilities: (1) the existing 20-foot-high, 482-foot- long Muskingum Lock and Dam No. 6; (2) an existing 476-acre reservoir with a normal pool elevation of 640.1 feet msl; (3) an existing 20 foot by 24 foot forebay with a 19-foot-wide vertical trashrack; (4) an existing powerhouse in the basement of the mill containing two proposed generating units with a total installed capacity of 235 kW; and (5) other appurtenances. The lock and dam is owned by the Ohio Department of Natural Resources, Division of Parks and Recreation. m. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE, Room 2A, Washington, D.C. 20426, or by calling (202) 208-1371. The application may be viewed on the web at http://www.ferc.fed.us/online/rims.htm (call (202) 208- 2222 for assistance). A copy is also available for inspection and reproduction at the address in item h. above. n. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission. Development Application--Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission's regulations, any completing development application [[Page 72341]] must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice. Protests or Motions to Intervene--Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. Filing and Service of Responsive Documents--The application is not ready or environmental analysis at this time; therefore, the Commission is not now requesting comments, recommendations, terms and conditions, or prescriptions. When the application is ready for environmental analysis, the Commission will issue a public notice requesting comments, recommendations, terms and conditions, or prescriptions. All filings must (1) bear in all capital letters, the title ``PROTEST'' or ``MOTION TO INTERVENE''; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. Any of these documents must be filed by providing the original and the number of copies required by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426. An additional copy must be sent to Director, Division of Project Review, Office of Hydropower Licensing, Federal Energy Regulatory Commission, at the above address. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. David P. Boergers, Secretary. [FR Doc. 99-33420 Filed 12-23-99; 8:45 am] BILLING CODE 6717-01-M