[Federal Register: January 20, 1999 (Volume 64, Number 12)] [Notices] [Page 3075-3076] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr20ja99-48] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Accepted for Filing; Application Ready for Environmental Analysis; and Soliciting Motions To Intervene, Protests, Comments, Final Terms and Conditions, Recommendations and Prescriptions January 13, 1999. Take notice that the following hydroelectric application, including applicant prepared draft environmental assessment, has been filed with the Commission and is available for public inspection: a. Type of Application: New Major License. b. Project No.: 420-009. c. Date filed: June 30, 1998. d. Applicant: City of Ketchikan, Ketchikan Public Utilities. e. Name of Project: Ketchikan Lakes Hydroelectric Project. f. Location: On Ketchikan Lakes and Ketchikan Creek in Ketchikan Gateway Borough and the City of Ketchikan, Alaska. The project is partially located within Tongass National Forest. g. Filed Pursuant to: Federal Power Act, 16 USC Secs. 791(a)- 825(r). h. Applicant Contact: Mr. Ron Settje, Administrative Manager, Ketchikan Public Utilities, 2930 Tongass Avenue, Ketchikan, AK 99901, (907) 225-1000 (ext. 388). i. FERC Contact: Any questions on this notice should be addressed to Charles Hall, E-mail address, charles.hall@ferc.fed.us, or telephone 202-219-2853. j. Deadline for filing motions to intervene and protest; comments, recommendations, terms and conditions; and prescriptions: 60 days from the issuance date of this notice. All documents (original and eight copies) should be filed with: David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission's Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. k. Status of environmental analysis: This application has been accepted for filing and is ready for environmental analysis at this time. l. Description of the Project: The project consists of the following existing facilities: (1) a 1,163 foot-long, 30-foot-high rock-fill dam on Ketchikan Lakes with a spillway crest elevation of 348 feet mean sea level (msl); (2) the Ketchikan Lakes with a surface area of 632 acres and a useable storage volume of 13,800 acre-feet; (3) Fawn Lake, a 3.1 acre forebay impoundment with a useable storage volume of 27 acre-feet; (4) a 30-foot-long, 12-foot-high concrete diversion dam with no useable storage on Granite Creek; (5) over 10,000 feet of interconnecting tunnels and pipelines; (6) a powerhouse containing four turbine-generator units with a total installed capacity of 4,200 kilowatts; and (7) appurtenant facilities. m. Locations of the application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE, Room 2A, Washington, D.C. 20426, or by calling (202) 208-1371. The application may be viewed on the web at www.ferc.fed.us. Call (202) 208-2222 for assistance. A copy is also available for inspection and reproduction at the address in item h above. n. This notice also consists of the following standard paragraphs: B1 and D6. [[Page 3076]] B1. Protests or Motions to Intervene--Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application. D6. Filing and Service of Responsive Documents--The application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions. The Commission directs, pursuant to Section 4.34(b) of the Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 1991) that all comments, recommendations, terms and conditions and prescriptions concerning the application be filed with the Commission within 60 days from the issuance date of this notice. All reply comments must be filed with the Commission within 105 days from the date of this notice. Anyone may obtain an extension of time for these deadlines from the Commission only upon a showing of good cause or extraordinary circumstances in accordance with 18 CFR 385.2008. All filings must (1) bear in all capital letters the title ``PROTEST'', ``MOTION TO INTERVENE'', ``COMMENTS,'' ``REPLY COMMENTS,'' ``RECOMMENDATIONS,'' ``TERMS AND CONDITIONS,'' or ``PRESCRIPTIONS;'' (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Any of these documents must be filed by providing the original and the number of copies required by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426. An additional copy must be sent to Director, Division of Project Review, Office of Hydropower Licensing, Federal Energy Regulatory Commission, at the above address. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 99-1165 Filed 1-19-99; 8:45 am] BILLING CODE 6717-01-M