[Federal Register: January 29, 1999 (Volume 64, Number 19)] [Notices] [Page 4641] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr29ja99-46] [[Page 4641]] ----------------------------------------------------------------------- DEPARTMENT OF DEFENSE Department of the Army Corps of Engineers Intent To Prepare a Draft Programmatic Environmental Impact Statement for the Section 33, the ``Missouri River Between Fort Peck Dam, Montana, and Gavins Point Dam, South Dakota and Nebraska,'' Bank Stabilization Project AGENCY: Army Corps of Engineers, DoD. ACTION: Notice of intent. ----------------------------------------------------------------------- SUMMARY: The dams and reservoirs on the upper Missouri River have caused a lowering of the streambed in the open reaches downstream from the dams. They have also caused a continuing net loss of high-bank lands, the reduction or elimination of the annual cycle of erosion and accretion, and a widening of the channel in some locations. The ``Section 33'' program was created by Congress with the expressed purpose of allowing the Corps of Engineers to assist affected landowners in alleviating these effects through a variety of measures. These measures include maintaining or rehabilitating existing bank stabilization structures, constructing new bank stabilization structures, purchasing affected property and monetary compensation. FOR FURTHER INFORMATION CONTACT: Questions about the proposed action and Draft EIS should be directed to Candace M. Thomas, Chief, Environmental and Economics Section, Water Resources Branch, U.S. Army Corps of Engineers, 215 North 17th Street, Omaha, Nebraska 68102-4978 or at 402-221-4575. SUPPLEMENTARY INFORMATION: The purpose of this programmatic Environmental Impact Statement (EIS) is to evaluate the potential degree or level of implementation of the alternative measures authorized by Congress, and their expected environmental impacts. Because the specific components of the Section 33 program are not known at this time, and specific sites have not been identified for development, this will be a programmatic EIS that identifies the general impacts and issues associated with each of the alternatives evaluated. The programmatic EIS provides for the coverage of general matters in a broader environmental document. Subsequent narrower and site-specific environmental analyses will be performed when specific projects are determined in the future. The Missouri River reaches included in the Section 33 program are as follows: a. Fort Peck Dam to about twenty miles upstream of Lake Sakakawea (RM 1770 to RM 1580). b. Garrison Dam to the upper end of Lake Oahe (RM 1390 to RM 1303). c. Oahe Dam to about Pierre, South Dakota (RM 1071 to RM 1066). d. About five miles downstream from Fort Randall Dam to Springfield, South Dakota (RM 875 to RM 832). e. Gavins Point Dam to about 20 miles upstream of Sioux City, Iowa (RM 810 to RM 752). Scoping meetings will be held on February 22, 1999 at the Sherman Motor Inn in Wolf Point, Montana at 6:30 p.m.; on February 23, 1999 at the Doublewood Inn in Bismarck, North Dakota at 6:30 p.m.; and on February 25, 1999 at the Prairie Inn & Convention Center in Vermillion, South Dakota at 6:30 p.m. These scoping meetings, as well as agency meetings, will be held to solicit input on the issues, studies needed, alternatives to be evaluated, and other related matters. Written comments will also be requested. Candace M. Thomas, Chief, Environmental & Economics Section, Water Resources Branch, Engineering Division. [FR Doc. 99-2185 Filed 1-28-99; 8:45 am] BILLING CODE 3710-62-M