[Federal Register: November 18, 1999 (Volume 64, Number 222)] [Notices] [Page 63023-63024] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr18no99-48] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. CP97-315-000, et. al. and CP98-319-000, CP98-200-000, CP98-540-000] Independence Pipeline Company, ANR Pipeline Company, National Fuel Gas Supply Corporation, and Transcontinental Gas Pipe Line Corporation; Notice of Availability of the Final Environmental Impact Statement for the Proposed Independence Pipeline and Market Link Expansion Projects November 12, 1999. The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a final environmental impact statement (EIS) on natural gas pipeline facilities proposed by ANR Pipeline Company (ANR), Independence Pipeline Company (Independence), National Fuel Gas Supply Corporation (National Fuel), and Transcontinental Gas Pipe Line Corporation (Transco) in the above-referenced dockets. The application and other supplemental filings in this docket area available for viewing on the FERC Internet website (www.ferc.fed.us). Click on the ``RIMS'' link, select ``Docket '' from the RIMS Menu, and follow the instructions. Similarly, the ``CIPS'' link on the FERC Internet website provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings. From the FERC Internet Website, click on the ``CIPS'' link, select Docket # from the CIPS menu, and follow the instructions . The final EIS was prepared to satisfy the requirements of the National Environmental Policy Act. The staff concludes that approval of the proposed projects, with appropriate mitigating measures as recommended, would have limited adverse environmental impact. The final EIS also evaluates alternatives to the proposal, including alternatives. [[Page 63024]] The final EIS assesses the potential environmental effects of the construction and operation of the following facilities in Illinois, Indiana, Michigan, Ohio, Pennsylvania, and New Jersey. ANR About 72.3 miles of high pressure pipeline looping in three segments, consisting of about 42.4 miles of 42-inch-diameter pipeline, and about 29.9 miles of 30-inch-diameter pipeline; 15,000 horsepower (hp) of additional compression at one existing compressor station, and minor modifications to two existing stations; and Six new internal tool or ``pig'' launchers along the new pipeline loops. Indepdence About 397.4 miles of 36-inch-diameter high pressure pipeline; 60,00 hp of compression at three new compressor stations; Three new meter stations; Six taps to local distribution companies; and 28 mainline valves along the pipeline. National Fuel Abandon, primary by removal, various segments of three existing pipelines within about 39.3 miles of right-of-way; and Minor modifications to remaining facilities along that section of right-of-way to maintain service to existing customers. Transco About 152.8 miles of high-pressure pipeline looping, consisting of our segments totaling 63.2 miles of 36- and 42-inch- diameter pipeline in Pennsylvania, six segments totaling 83.3 miles of 36- and 42-inch-diameter pipeline in New Jersey, and 6.3 miles of 36- inch-diameter replacement in New Jersey; 62,400 hp of additional compression at three existing compressor stations, and replaced impeller at one existing compressor station; Modifications to three regulator stations; and One new pig launcher. The purpose of the proposed projects is to transport up to 1 billion cubic feet per day of natural gas, principally from ANR's existing system (in the Chicago, Illinois area) to markets in the eastern United States. Docket Nos. CP97-315-000, et al. The final EIS will be used in the regulatory decision-making process at the FERC and may be presented as evidentiary material in formal hearings a the FERC. While the period for filing interventions in these cases have expired, motions to intervene out of time can be filed with the FERC in accordance with the Commission's Rules and Practice and Procedures, 18 Code of the Federal Regulations (CFR) 385.214(d). Further, anyone desiring to file a protest with the FERC should do so in accordance with 18 CFR 385.211. A final EIS has been placed in the public files of the FERC and is available for public inspection at: Federal Energy Regulatory Commission, Public Reference and Files Maintenance Branch, 888 First Street, NE., Room 2A, Washington, DC 20426, (202) 208-1371. A limited number of copies are available from the Public Reference and Files Maintenance Branch identified above. In addition, the final EIS have been mailed to Federal, state, and local agencies; public interest groups; those individuals/groups who filed comments on the final EIS; affected landowners/individuals who requested a copy of the final EIS; libraries; newspaper; and parties to this proceeding. Additional information about the proposed projects is available from Paul McKee in the Commission's Office of External Affairs, at (202) 208-1088 or on the FERC website (www.ferc.fed.us) using the ``RIMS'' link to information in this docket number. For assistance with access to RIMS, the RIMS helpline can be reached at (202) 208-2222. Access to the texts of formal documents issued by the Commission with regard to this docket, such as orders and notices, is also available on the FERC website using the ``CIPS'' link. For assistance with access to CIPS, the CIPS helpline can be reached at (202) 208-2474. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 99-30081 Filed 11-17-99; 8:45 am] BILLING CODE 6717-01-M