[Federal Register: October 21, 1999 (Volume 64, Number 203)] [Notices] [Page 56784] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr21oc99-59] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Tendered for Filing With the Commission, Establishing a Deadline for Final Amendment, and Soliciting Additional Study Requests October 15, 1999. Take notice that the following hydroelectric application has been filed with the commission and is available for public inspection: a. Type of application: New Major License b. Project No.: 2416-009 c. Date filed: October 5, 1999 d. Applicant: Aquenergy Systems Inc. e. Name of project: Ware Shoals Project. f. Location: On Saluda River in the Town of Ware Shoals, within the counties of Laurens, Greenwood and Abbeville, South Carolina. No Federal Lands used in this project. g. Filed pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r). h. Applicant contact: Beth Harris, P.E., CHI Energy, Inc., P.O. 5897, Greenville, SC 29604, (864) 281-9630 Ext. 105. i. FERC contact: Any questions on this notice should be addressed to Timothy Looney, E-mail address, timothy.looney@ferc.fed.us, or telephone 202-219-2852. j. Deadline for filing final amendments: February 5, 2000. k. Deadline for filing additional study requests: December 6, 1999. All documents (original and eight copies) should be filed with: David P. Boergers, Secretary Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. The Commission's rules of practice and procedure require all intervenors filing documents with the commission to deserve a copy of that document on each person whose name appears on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. l. Status of environmental analysis: This application is not ready for environmental analysis at this time. m. The existing project consists of a dam and reservoir, a power canal and two turbine generating units with a total nameplate rating of 6,200-kilowatts, and appurtenant facilities. The project would have an annual generation of 23,500,000 kilowatt hours. The applicant does not propose any modifications to the project features or operation. n. A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street, NE, Room 2A, Washington, DC 20426, or by calling (202) 208-1371. This filing may be viewed on the web to http:// www.ferc.fed.us/online/rims.htm call 202-208-2222 for assistance). A copy is also available for inspection and reproduction at the address in item h above. o. With this notice we are initiating consultation with the South Carolina State Historic Preservation Officer as required by Sec. 106, National Historic Preservation Act, and the regulations of the Advisory Council on Historic Preservation, 36 CFR 800.4. David P. Boergers, Secretary. [FR Doc. 99-27486 Filed 10-20-99; 8:45 am] BILLING CODE 6717-01-M