[Federal Register: September 15, 1998 (Volume 63, Number 178)] [Notices] [Page 49344] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr15se98-59] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP98-757-000] Destin Pipeline Company, L.L.C.; Notice of Request Under Blanket Authorization September 10, 1998. Take notice that on September 2, 1998, Destin Pipeline Company, L.L.C. (Applicant), Post Office Box 2563, Birmingham, Alabama, 35202- 2563, filed in Docket No. CP98-757-000 a request pursuant to Sections 157.205 and 157.211 of the Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and 157.211) for approval to construct, own, and operate certain facilities located in Jackson County, Mississippi, for the delivery of natural gas to Chevron Products Company (Chevron Products) under Applicant's blanket certificate issued in Docket No. CP96-657-000 and CP96-657-001, pursuant to Section 7(C) of the Natural Gas Act (NGA), all as more fully set forth in the request which is on file with the Commission and open to public inspection. Applicant proposes to construct and operate a meter station consisting of three ten-inch orifice meters and appurtenant facilities, including 3.38 miles of sixteen-inch pipeline extending from a point at or near Mile Post 79.8 on Applicant's thirty-six-inch mainline to an interconnection with the proposed meter station, electronic custody transfer equipment, pressure control regulation equipment, and other rappurtenant facilities. Applicant sates that it will own and operate the proposed facilities as part of its pipeline system. It is further stated that the total estimated cost of the facilities proposed herein is $3.5 Million, which cost will be 100 percent borne by Applicant. Applicant asserts that it will provide transportation service of 10,000 Mcf per Day to Chevron Products under Applicant's Rate Schedule FT-1 and that additional volumes of natural gas may be transported to the proposed new delivery point from time to time on behalf of Chevron Products on an interruptible basis pursuant to Applicant's Rate Schedule IT. Applicant further asserts that the performance of the transportation services for Chevron Products will have no adverse impact on Applicant's peak day capabilities and annual deliveries. Any person or the Commission's Staff may, within 45 days of the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Rules of Practice and Procedure (18 CFR 385.214), a motion to intervene and pursuant to Section 157.205 of the regulations under the Natural Gas Act (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefor, the proposed activities shall be deemed to be authorized effective the day after the time allowed for filing a protest. If a protest is filed and not withdrawn 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the Natural Gas Act. David P. Boergers, Secretary. [FR Doc. 98-24682 Filed 9-14-98; 8:45 am] BILLING CODE 6717-01-M