[Federal Register: July 24, 1998 (Volume 63, Number 142)] [Notices] [Page 39866-39867] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr24jy98-93] ----------------------------------------------------------------------- ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-5493-9] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7167 OR (202) 564-7153. Weekly receipt of Environmental Impact Statements Filed July 13, 1998 Through July 17, 1998 Pursuant to 40 CFR 1506.9 EIS No. 980269, Draft EIS, AFS, ID, Eagle Bird Project Area, Timber Harvesting and Road Construction, Idaho Panhandle National Forests, St. Joe Ranger District, Shoshone County, ID, Due: September 07, 1998, Contact: Cameo Flood (208) 245-4517. EIS No. 980270, Final EIS, FHW, NC, US 70 Improvements Project, I-40 to the Intersection of US 70 and US 70 Business, Funding and COE Section 404 Permit, Wake and Johnston Counties, NC, Due: August 24, 1998, Contact: Nicholas L. Graf, P.E. (919) 733-7842 ext. 260. EIS No. 980271, Draft EIS, FHW, IN, US 231 Transportation Project, New Construction from CR-200 N to CR-1150'1, Funding, Right-of-Way Permit and COE Section 404 Permit, Spencer and Dubois Counties, IN, Due: October 15, 1998, Contact: Douglas N. Head (317) 226-7487. EIS No. 980272, Draft EIS, NOA, MS, Grand Bay National Estuarine Research Reserve (NERR), Designation, To Conduct Research, Educational Project and Construction, East of the City of Biloxi, Jackson County, MS, Due: September 07, 1998, Contact: Stephanie Thornton (301) 713-3125 ext. 110 EIS No. 980273, Draft Supplement, FTA, PR, Tren Urbano Transit Project, Updated Information for the Minillas Extension, Construction and Operation, San Juan Metropolitan Area, Funding, NPDES Permit, US Coast Guard Bridge Permit and COE Section 10 and 404 Permits, PR, Due: September 07, 1998, Contact: Alex McNeil (404) 562-3511. EIS No. 980274, Final EIS, FRC, NB, Kingsley Dam Project (FERC. No. 1417) and North Platte/Keystone Diversion Dam (FERC. No. 1835) Hydroelectric Project, Application for Licenses, Near the confluence of the North/South Platte Rivers, Keith, Lincoln, Garden, Dawson and Gasper Counties, NB, August 24, 1998, Contact: Frankie Green (202) 501- 7704. [[Page 39867]] EIS No. 980275, Draft EIS, FAA, NC, Charlotte/Douglas International Airport, Construction and Operation, New Runway 17/35 (Future 18L/36R Associated Taxiway Improvements, Master Plan Development, Approval Airport Layout Plan (ALP) and COE Section 404 Permit, Mecklenburg County, NC, Due: September 07, 1998, Contact: Thomas M. Roberts (404) 305-7153. EIS No. 980276, Draft EIS, BOP, PA, Greater Scranton Area, United States Penitentiary (USP) Construction and Operation, Site Selection, Lackawanna and Wayne Counties, PA, Due: September 8, 1998, Contact: David J. Dorworth (202) 514-6470. EIS No. 980277, Draft EIS, DOE, ID, Advanced Mixed Waste Treatment Project, Construction and Operation, Site Selected, Idaho National Engineering and Environmental Laboratory (INEEL), Eastern Snake River Plain, ID, Due: September 11, 1998, Contact: John Medema (208) 526- 1407. EIS No. 980278, Final EIS, AFS, ID, North Round Valley Timber Sales and Road Construction, Implementation, Payette National Forest, New Meadows Ranger District, Adams County, ID, Due: August 24, 1998, Contact: Kimberly Brandel (208) 347-0300. Amended Notices EIS No. 980171, Draft EIS, COE, TX, Dallas Floodway Extension, Implementation, Trinity River Basin, Flood Damage Reduction and Environmental Restoration, Dallas County, TX, Due: August 14, 1998, Contact: Gene T. Rice, Jr. (817) 978-2110. Published FR 05-15-98-- Review Period extended. EIS No. 980267, Draft EIS, DOE, CA, NM, TX, ID, C, WA, Surplus Plutonium Disposition (DOE/EIS-0283) for Siting, Construction and Operation of three facilities for Plutonium Disposition, Possible Sites Hanford, Idaho National Engineering and Environmental Laboratory, Pantex Plant and Savannah River, CA, ID, NM, SC, TX and WA, Due: September 16, 1998, Contact: G. Bert Stevenson (202) 586-5368. This EIS was inadvertently omitted from the 07-17-98 Federal Register. The official 45 days NEPA review period is calculated from 07-17-98. Dated: July 21, 1998. William D. Dickerson, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 98-19885 Filed 7-23-98; 8:45 am] BILLING CODE 6560-50-P