[Federal Register: August 19, 1998 (Volume 63, Number 160)] [Notices] [Page 44432] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr19au98-46] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3428-080-ME] Androscoggin County, Maine; Notice of Availability of Environmental Assessment August 13, 1998. An environmental assessment (EA) is available for public review. The EA was prepared for an application filed by Miller Hydro Group, Incorporated on May 15, 1998, requesting the Commission to amend its license for the existing Worumbo Hydroelectric Project. The proposed amendment would permit the licensee: (1) to increase the normal evaluation of the project impoundment by 1.5 feet (from 97.0 feet mean sea level (msl) to 98.5 feet msl) by installing crest control gates on the Durham side and manual hinged flashboards on the Lisbon side of the existing dam; and (2) to implement periodic 1.5-foot reservoir drawdowns. The EA evaluates the environmental impacts that would result from implementing the proposed amendment of license; the document concludes that approval of the application would not constitute a major federal action significantly affecting the quality of the human environment. The EA was written by staff in the Office of Hydropower Licensing, Federal Energy Regulatory Commission. Copies of the EA can be viewed at the Commission's Reference and Information Center, Room 2A, 888 First Street, N.E., Washington, D.C., 20426. Copies also may be obtained by calling the EA coordinator, Jim Haimes, at (202) 219-2780. David P. Boergers, Secretary. [FR Doc. 98-22250 Filed 8-18-98; 8:45 am] BILLING CODE 6717-01-M