[Federal Register: September 1, 1998 (Volume 63, Number 169)] [Notices] [Page 46441] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr01se98-52] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 8732-004-VA] City of Manassas, Virginia Department of Public Works; Notice of Availability of Environmental Assessment August 26, 1998. An environmental assessment (EA) is available for public review. The EA was prepared for an application filed by the City of Manassas, Virginia, Department of Public Works on December 22, 1997, to surrender its existing exemption from licensing for the Broad Run Hydroelectric Project. The EA evaluates the environmental impacts that would result from permanently discontinuing electric generation at the existing powerhouse located below the City's T. Nelson Elliott Dam and 650-acre Lake Manassas. The document concludes that approval of the application would not constitute a major federal action significantly affecting the quality of the human environment. The EA was written by staff in the Office of Hydropower Licensing, Federal Energy Regulatory Commission. Copies of the EA can be viewed at the Commission's Reference and Information Center, Room 2A, 888 First Street, N.E., Washington, D.C., 20426. Copies also may be obtained by calling the EA coordinator, Peter Yarrington, at (202) 219-2939. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 98-23414 Filed 8-31-98; 8:45 am] BILLING CODE 6717-01-M