[Federal Register: August 21, 1998 (Volume 63, Number 162)] [Notices] [Page 44939] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr21au98-88] ======================================================================= ----------------------------------------------------------------------- NUCLEAR REGULATORY COMMISSION [Docket No. 50-461] Illinois Power Co., Clinton Power Station, Unit 1; Notice of Partial Denial of Amendment to Facility Operating License and Opportunity for Hearing The U.S. Nuclear Regulatory Commission (the Commission) has partially denied a request by Illinois Power Company (the licensee) to amend Facility Operating License NPF-62 issued to the licensee for operation of the Clinton Power Station, Unit 1, located in DeWitt County, Illinois. Notice of Consideration of Issuance of the amendment was published in the Federal Register on December 20, 1995 (60 FR 65681). The purpose of the licensee's amendment request was to revise Technical Specification (TS) 5.2.2.e, ``Unit Staff,'' by revising the requirements for controls on the working hours of unit staff who perform safety related functions and by removing the requirement for monthly review of individual overtime. The proposed changes were denied in part. The licensee's request to remove the monthly review of individual overtime requirement was denied because this removal would result in working hours controls that would not be sufficient to assure that adequate shift coverage is maintained without routine heavy use of overtime. The NRC staff has concluded that part of the licensee's request cannot be granted. The licensee was notified of the Commission's partial denial of the proposed change by letter dated August 13, 1998. By September 21, 1998, the licensee may demand a hearing with respect to the partial denial described above. Any person whose interest may be affected by this proceeding may file a written petition for leave to intervene. A request for hearing or petition for leave to intervene must be filed with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555, Attention: Rulemakings and Adjudications Staff, or may be delivered to the Commission's Public Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC, by the above date. A copy of any petition should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and to Leah Manning Stetzner, Vice President, General Counsel, and Corporate Secretary, 500 South 27th Street, Decatur, IL 62525, attorney for the licensee. For further details with respect to this action, see (1) the application for amendment dated October 27, 1995, and (2) the Commission's letter to the licensee dated August 13, 1998. These documents are available for public inspection at the Commission's Public Document Room and at the local public document room located at the Vespasian Warner Public Library, 120 West Johnson Street, Clinton, IL 61727. Dated at Rockville, MD, this 13th day of August 1998. For the Nuclear Regulatory Commission. Jon B. Hopkins, Senior Project Manager, Project Directorate III-3, Division of Reactor Projects--III/IV, Office of Nuclear Reactor Regulation. [FR Doc. 98-22527 Filed 8-20-98; 8:45 am] BILLING CODE 7590-01-P