[Federal Register: August 28, 1998 (Volume 63, Number 167)] [Notices] [Page 46013-46014] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr28au98-80] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Application Ready for Environmental Analysis August 24, 1998. Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection: a. Type of Application: New Major License. b. Project No.: 2385-002. c. Date filed: December 4, 1991. d. Applicant: Finch, Pruyn, and Company, Inc. e. Name of Project: Glens Falls Project. f. Location: On the Hudson River in Warren and Saratoga Counties, New York. g. Filed Pursuant to: Federal Power Act 16 USC 791(a)-825(R). h. Applicant Contact: Mr. David P. Manny, Finch, Pruyn, and Company, Inc., 1 Glen Street, Glens Falls, NY 12801-0396, (518) 793- 2541. i. FERC Contact: John McEachern (202) 219-3056. j. Description of Project: The project consists of: (1) a portion of a seven-gate barrage-type dam that is 468-foot long, 16-foot-high, with 5-foot-high flashboards including: (a) a Wingwall No. 1, constructed in 1991, which together with Pier No. 1, is the left abutment of the dam and future right abutment of the proposed headgate structure (to be redeveloped in 1999), (b) an upper forebay wall; (c) a bridge pier of Route 9 Bridge integral with the forebay walls; and (d) a powerhouse headwall penetrated by six pressure cases, together with its left abutment; (2) a 167-acre impoundment with a normal minimum and maximum elevation of 268.6 and 269.1 feet national geodetic vertical datum (NGVP), respectively, and a gross and usable storage capacity of 1,083 acre-feet; (3) a concrete headgate structure with eight 7.5-foot- wide and 12-foot-high wooden slide gates that control flow to the power canal; (4) a 550-foot-long, 80-foot-wide, and 21 to 37-foot-deep power canal that supplies water to the powerhouse and to a paper mill; (5) a 98-foot by 136-foot reinforced concrete powerhouse located in the FPC paper mill containing five horizontal Francis turbines and generators with an installed capacity of 12.09 mega-watts, hydraulic capacity of 4,465 cubic feet per second (cfs), and design head of 46 feet; (6) five-arch tailrace tunnels of which two are interconnected that exit the powerhouse on the south side of the mill; (7) a 34.5 kV transmission line connected to the NiMo power grid; and (8) appurtenant structures. The existing dam is owned by Finch, Pruyn, Company (FPC) and Niagara Mohawk Power Corporation (NiMo). FPC owns gates 6 and 7 and NiMo owns gates (1 through 5). All other elements of the facility are exclusively owned by FPC. A Commission consent order dated November 13, 1991, required NiMo and FPC to rehabilitate the dam at Glens Falls. Subsequent to the order, NiMo leased its holdings to Adirondack Hydro Development Corporation (ADHC), the licensee of the South Glens Falls Hydroelectric Project No. 5461. Reconstruction of the dam included 121 feet of the north section (including gate bays 6 and 7) owned by FPC. The only portion of the dam remaining to be rehabilitated is the FPC power canal headgate structure. FPC intends to complete rehabilitation of this feature in 1999. ADHC and FPC equally share the use of the river flows up to plant capacities. River flows above 5,565 cfs are spilled over the dam under existing project conditions when both FPC and ADHC are operating. k. Status of Environmental Analysis: This application is now ready for environmental analysis--see attached paragraph D9. [[Page 46014]] l. Deadline for comments, recommendations, terms and conditions, and prescriptions: See paragraph D9. m. This notice also consists of the following standard paragraphs: A4 and D9. n. Available Locations of Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference and Files Maintenance Branch, located at 888 First Street NW., Washington, DC 20426, or by calling (202) 208-1371. A copy is also available for inspection and reproduction at the address shown in item h. A4. Development Application--Public notice of the filing of the initial development application, which has already been given, established the due date for filing competing applications or notices of intent. Under the Commission's regulations, any competing development application must be filed in response to and in compliance with public notice of the initial development application. No competing applications or notices of intent may be filed in response to this notice. D9. Filing and Service and Responsive Documents--The application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions. The Commission directs, pursuant to Section 4.34(b) of the Regulations (see Order No. 533, issued May 8, 1991, 56 FR 23108, May 20, 1991) that all comments, recommendations, terms and conditions, and prescriptions concerning the application be filed with the Commission within 60 days from the issuance date of this notice. All reply comments must be filed with the Commission within 105 days from the date of this notice. Anyone may obtain an extension of time for these deadlines from the Commission only upon a showing of good cause or extraordinary circumstances in accordance with 18 CFR 385.2008. All filings must (1) bear in all capital letters the title ``COMMENTS'' ``REPLY COMMENTS'', ``RECOMMENDATIONS'', ``TERMS AND CONDITIONS'', or PRESCRIPTIONS''; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person submitting the filing; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions, or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Any of these documents must be filed by providing the original and the number of copies required by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. An additional copy must be sent to Director, Office of Hydropower Licensing, Federal Energy Regulatory Commission, at the above address. Each filing must be accompanied by proof of service on all persons listed on the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34.(b), and 385.2010. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 98-23114 Filed 8-27-98; 8:45 am] BILLING CODE 6717-01-M