[Federal Register: December 8, 1998 (Volume 63, Number 235)] [Notices] [Page 67678] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr08de98-56] ----------------------------------------------------------------------- DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP99-87-000] Southern Natural Gas Company; Notice of Application to Abandon December 2, 1998. Take notice that on November 24, 1998, Southern Natural Gas Company (Southern), P.O. Box 2563, Birmingham, Alabama, 35202-2563, filed pursuant to Section 7(b) of the Natural Gas Act, for authority to abandon by removal, two compressor units and related facilities comprising Southern's Pugh Compressor Station, in Noxubee County, Mississippi, all as more fully described in the application on file with the Commission and open to public inspection. The Pugh Compressor Station is located at the Pugh interconnect, where Southern's 24-inch North Main Line crosses Tennessee's 30-inch Delta-Portland Line. Southern and Tennessee have abandoned the exchange agreement which made the compressor station necessary. Southern will either dispose of the compressor units for salvage or place the units in inventory for future use. Any person desiring to be heard or make any protest with reference to said application should on or before December 23, 1998, file with the Federal Energy Regulatory Commission, 888 First Street, N.E., Washington D.C. 20426, a motion to intervene or a protest in accordance with the requirements of the Commission's Rules of Practice and Procedure (18 CFR 385.214 or 385.211) and the regulations under the Natural Gas Act (18 CFR 157.10). All protests filed with the Commission will be considered by it in determining the appropriate action to be taken but will not serve to make the Protesters parties to the proceeding. Any person wishing to become a party to a proceeding or to participate as a party in any hearing therein must file a motion to intervene in accordance with the Commission's Rule's. Take further notice that, pursuant to the authority contained in and subject to the jurisdiction conferred upon the Federal Energy Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and the Commission's Rules of Practice and Procedure, a hearing will be held without further notice before the Commission or its designee on this application if no motion to intervene is filed within the time required, or if the Commission on its own review of the matter finds that permission and approval of the proposed abandonment are required by the public convenience and necessity. If a motion for leave to intervene is timely filed, or if the Commission on its own motion believes that a formal hearing is required, further notice of such hearing will be duly given. Under the procedure herein provided for, unless otherwise advised, it will be unnecessary for Southern to appear or be represented at the hearing. Linwood A. Watson, Jr., Acting Secretary. [FR Doc. 98-32476 Filed 12-7-98; 8:45 am] BILLING CODE 6717-01-M