[Federal Register: September 4, 1998 (Volume 63, Number 172)] [Rules and Regulations] [Page 47174] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr04se98-15] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF TRANSPORTATION Coast Guard 33 CFR Part 117 [CGD07-98-055] Drawbridge Operation Regulations; Biscayne Bay, Miami, FL AGENCY: Coast Guard, DOT. ACTION: Notice of temporary deviation from regulations. ----------------------------------------------------------------------- SUMMARY: Notice is hereby given that the Coast Guard has issued a temporary deviation to the regulation governing the operation of the East Venetian Causeway Drawbridge across Biscayne Bay, between Miami and Miami Beach, at Miami Beach, Dade County, Florida. This deviation allows the drawbridge owner or operator to close the bridge from 5 p.m. until 8 a.m. daily. The draw will open each hour on the hour from 8 a.m. to 5 p.m., daily. The draw shall open at any time for public vessels of the United States, State and local vessels used in public safety, vessels in distress where a delay would endanger life or property, commercial vessels engaged in rescue or emergency salvage operations, and vessels seeking shelter from severe weather. This temporary deviation is issued to allow the bridge owner to safely conduct necessary repairs to the drawbridge. DATES: This deviation is effective from 8 a.m. on August 21 until 5 p.m. on October 19, 1998. FOR FURTHER INFORMATION CONTACT: Mr. Brodie Rich, Project Manager, Seventh Coast Guard District, Bridge Section at (305) 536-5117. SUPPLEMENTARY INFORMATION: Background and Purpose The East Venetian Causeway Drawbridge across Biscayne Bay between Miami and Miami Beach, has a vertical clearance of 5.8 feet above mean high water (MHW) and 8 feet above mean low water (MLW) measured at the fenders in the closed position. On August 12, 1998, the State of Florida Department of Transportation requested a deviation from the current operating schedule in 33 CFR 117.269. This temporary deviation was requested to allow necessary repairs to the drawbridge and relieve concerns by the Venetian Isle residents that the leafs of the drawbridge might get caught in the open-to-navigation position, thereby stranding residents on the islands while the West Venetian Drawbridge over the Intracoastal Waterway is being replaced. The District Commander has granted a temporary deviation from the operating requirements listed in 33 CFR 117.269 governing the East Venetian Causeway Bridge across Biscayne Bay in accordance with the provisions of 33 CFR 117.35(a) for the purpose of conducting repairs to the drawbridge. Under this deviation, the East Venetian Causeway Drawbridge need open only on the hour from 8 a.m. to 5 p.m., daily. At all other times, the drawbridge may remain in the closed position. The deviation is effective for a period of 60 days beginning on August 21, 1998 and ending on October 19, 1998. Dated: August 24, 1998. Norman T. Saunders, Rear Admiral, U.S. Coast Guard, Commander, Seventh Coast Guard District. [FR Doc. 98-23899 Filed 9-3-98; 8:45 am] BILLING CODE 4910-15-M