[Federal Register: December 4, 1998 (Volume 63, Number 233)] [Notices] [Page 67054-67055] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr04de98-49] ======================================================================= ----------------------------------------------------------------------- DEPARTMENT OF DEFENSE Department of the Army Finding of No Significant Impact (FNSI) and Final Programmatic Environmental Assessment (PEA) for the Army National Guard Pest Management Program AGENCY: National Guard Bureau, Department of the Army, DoD. ACTION: Notice of availability. ----------------------------------------------------------------------- SUMMARY: Pursuant to Section 102(2)(c) of the National Environmental Policy Act of 1969; the Council on Environmental Quality (CEQ) Regulations (40 CFR Part 1500-1508); and Army Regulation 200-2, the National Guard Bureau (NGB) gives notice that an Environmental Impact Statement (EIS) is not being prepared for adoption of an Integrated Pest Management (IPM) Program. DATES: The public review period for this FNSI and PEA ends on January 4, 1999. ADDRESSES: Copies of the FNSI and PEA can be obtained by contacting Ms. Pamela Goodman, National Guard Bureau, Office of Public Affairs, Environmental Branch, 4501 Ford Avenue, Alexandria, VA 22301. FOR FURTHER INFORMATION CONTACT: Ms. Pamela Goodman at 1-800-252-8959. SUPPLEMENTARY INFORMATION: A PEA has been prepared to examine the potential environmental impacts associated with this determination. The EA for this Federal action indicates that the project will not cause significant local, regional, or national impacts on the environment. As a result of these findings, the NGB has determined that the preparation and review of an EIS is not needed for this project. Based on the findings, the NGB has reached a FNSI with regard to its determination on this proposed action. The final PEA describes and analyzes the proposed action, consisting of three action alternatives, and the no action option. The alternatives analyzed were: (1) mechanical, cultural, and biological management techniques; (2) chemical management techniques; (3) an emphasis on nonchemical techniques with limited chemical management techniques with a general reduction of toxic chemical used by 50%; and (4) no action. All alternatives could have been implemented in full compliance with applicable state and Federal laws and regulations. Alternative number 3 was selected for implementation. The NGB provided a 30-day public comment period on the draft PEA. The draft PEA was also forwarded to the Environmental Protection Agency, the [[Page 67055]] CEQ, and several other Federal and state agencies, as well as several national environmental groups for review and comment. The final PEA was refined based upon the comments received. Analysis and response to the comments received have also been incorporated into the FNSI. The NGB has found the PEA adequate for its decision to adopt the IPM program and has issued its FNSI. Copies of the FNSI, executive summary of the final PEA, and/or the complete PEA will be mailed to individuals who participate in the Draft PEA review process. Copies will also be sent to select Federal and state agencies. Individuals not currently on the mailing list may obtain a copy be request. Dated: December 1, 1998. Raymond J. Fatz, Deputy Assistant Secretary of the Army, (Environment, Safety and Occupational Health) OASA (I,L&E). [FR Doc. 98-32320 Filed 12-3-98; 8:45 am] BILLING CODE 3710-08-M