[Federal Register: September 11, 1998 (Volume 63, Number 176)] [Notices] [Page 48726-48727] From the Federal Register Online via GPO Access [wais.access.gpo.gov] [DOCID:fr11se98-74] ----------------------------------------------------------------------- ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-5495-4] Environmental Impact Statements and Regulations; Availability of EPA Comments Availability of EPA comments prepared August 10, 1998 Through August 14, 1998 pursuant to the Environmental Review Process (ERP), under Section 309 of the Clean Air Act and Section 102(2)(c) of the National Environmental Policy Act as amended. Requests for copies of EPA comments can be directed to the OFFICE OF FEDERAL ACTIVITIES AT (202) 564-7167. An explanation of the ratings assigned to draft environmental impact statements (EISs) was published in FR dated April 10, 1998 (62 FR 17856). Draft EISs ERP No. D-AFS-L65293-00 Rating EC2, Upper Columbia River Basin Ecosystem Based Lands Management Plan, Implementation, Interior Columbia Basin Ecosystem Management Project, ID, MT, WY, NV and UT. Summary: EPA expressed environmental concerns with these issues: (1) the lack of adequate provisions to identify and protect high quality waters and aquate habitats, (2) the uncertainty with how impaired waters will be addressed, (3) the uncertainty with the nature of restoration and conservation efforts and their associated impacts, (4) the lack of [[Page 48727]] a clear protocol for determining how conflicts between competing objectives and needs will be resolved, (5) the implications of less than full budget for implementation. EPA suggests combining some of the features of Alternatives 7 and 6 with Alternative 4. EPA strongly supports ecosystem management principles on a broad scale to analyze resources issues that transcend jurisdictional boundaries. ERP No. D-COE-E32078-00 Rating EO3, Savannah Harbor Section 203 Expansion Project, Channel Deepening, Harbor Improvements, Georgia Ports Authority, Federal Navigation Project, Chatham County, Ga and Jasper County, SC. Summary: EPA concluded that the document does not contain adequate modeling and sediment chemistry information necessary to make a decision as to the biotic and water quality impacts. EPA also had environmental objections about the extent/duration of adverse impacts resulting from the magnitude of channel deepening and whether necessary mitigation for functional losses is practicable. ERP No. D-FHW-D40143-MD Rating EC2, MD-331--Dover Bridge, Construction, Right-of-Way Grant, US Coast Guard Bridge Permit and COE Section 404 Permit, Easton, Talbot and Caroline County, MD. Summary: EPA expressed environmental concerns regarding impacts to aquatic resources, including associated tidal marsh wetlands. EPA requested additional information on storm water run-off, bridge shading effects and wetland mitigation. ERP No. D-FHW-L40207-WA Rating EC2, Interstate 90 (I-90) South Sammamish Plateau Access Road and Sunset Interchange Modifications, Construction, COE Section 404 Permit, Coastal Zone Management and NPDES Permits, King County, WA. Summary: EPA expressed environmental concerns based on potential adverse environmental effects to waters of the United States from the project and undisclosed potential cumulative affects from planned activities in lands adjacent to the project site. More information is needed to clarify design specifications to ensure that proper stormwater management practices will be implemented to appropriately protect receiving-water quality. ERP No. D-NOA-B91026-ME Rating EC1, Atlantic Herring (Clupea harengus harengus) Fishery Management Plan (FWP), Management Measures, Exclusive Ecosystem Zone (EEZ), Gulf of Maine, George Bank, ME. Summary: EPA supports the actions proposed by NMFEs; additional information was requested for enforcement of fishery management plan, and adulteration of scallop meat. Final EISs ERP No. F-COE-E32077-GA Brunswick Harbor Deepening Federal Navigation Project, Improvements, Brunswick, Glynn County, GA. Summary: EPA continues to be concerned about the project's adverse impacts and mitigations, while a number of modifications/clarifications were made to the channel upgrade. Future interagency coordination will be necessary. Other ERP No. LD-COE-L36111-WA Rating EC2, Howard A. Hanson Dam (HHD Additional Water Storage (AWS) Phase I Project, Construction and Operation, Green River Basin, Pierce and King Counties, WA. Summary: EPA expressed environmental concerns on potential cumulative impacts of activities in adjacent lands, potential indirect effects on fish habitat and water quality, and discussion of a possibly restricted range of alternatives. EPA also identified the need for a clear statement of public disclosure of Phase I monitoring results before initiating Phase II of the project. Dated: September 8, 1998. William D. Dickerson, Director, NEPA Compliance Division, Office of Federal Activities. [FR Doc. 98-24493 Filed 9-10-98; 8:45 am] BILLING CODE 6560-50-U