[Federal Register: May 7, 2002 (Volume 67, Number 88)]
[Notices]               
[Page 30728]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr07my02-84]                         

-----------------------------------------------------------------------

NUCLEAR REGULATORY COMMISSION

[Docket No. 50-336]

 
Dominion Nuclear Connecticut, Inc.; Notice of Issuance of 
Amendment to Facility Operating License

    The U.S. Nuclear Regulatory Commission (Commission) has issued 
Amendment No. 265 to Facility Operating License No. DPR-65 issued to 
Dominion Nuclear Connecticut, Inc., (the licensee), which revised the 
Final Safety Analysis Report (FSAR) for operation of the Millstone 
Nuclear Power Station, Unit No. 2, (MP2), located in New London County, 
Connecticut. The amendment is effective as of the date of issuance.
    The amendment modified the MP2 FSAR, Chapter 14, description of the 
Steam Generator Tube Rupture (SGTR) event and its associated 
radiological dose consequences. The changes are not the result of 
hardware changes to the plant or changes in operating practices. 
Rather, the changes are the result of incorporating a postulated loss 
of offsite power into the event analyses as well as revised assumptions 
and analysis methodology. The FSAR changes show that the postulated 
dose consequences for the updated SGTR analysis are higher than the 
dose consequences for the previous analysis. However, the updated dose 
consequences are less than the dose guidelines of 10 CFR Part 100, 
Reactor Site Criteria, and 10 CFR Part 50, Appendix A, General Design 
Criterion (GDC) 19, Control Room.
    The application for the amendment complies with the standards and 
requirements of the Atomic Energy Act of 1954, as amended (the Act), 
and the Commission's rules and regulations. The Commission has made 
appropriate findings as required by the Act and the Commission's rules 
and regulations in 10 CFR Chapter I, which are set forth in the license 
amendment.
    Notice of Consideration of Issuance of Amendment to Facility 
Operating License and Opportunity for a Hearing in connection with this 
action was published in the Federal Register on April 23, 2001 (66 FR 
20485). No request for a hearing or petition for leave to intervene was 
filed following this notice.
    The Commission has prepared an Environmental Assessment related to 
the action and has determined not to prepare an environmental impact 
statement. Based upon the environmental assessment, the Commission has 
concluded that the issuance of the amendment will not have a 
significant effect on the quality of the human environment (67 FR 
18044).
    Further details with respect to the action see (1) the application 
for amendment dated December 21, 2000, as supplemented June 29, 2001, 
(2) Amendment No. 265 to License No. DPR-65, (3) the Commission's 
related Safety Evaluation, and (4) the Commission's Environmental 
Assessment. Documents may be examined, and/or copied for a fee, at the 
NRC's Public Document Room, located at One White Flint North, 11555 
Rockville Pike (first floor), Rockville, Maryland. Publicly available 
records will be accessible electronically from the Agencywide Documents 
Access and Management Systems (ADAMS) Public Electronic Reading Room on 
the internet at the NRC Web site, http://www.nrc.gov/reading-rm/
adams.html. Persons who do not have access to ADAMS or who encounter 
problems in accessing the documents located in ADAMS, should contact 
the NRC Public Document Room Reference staff by telephone at 1-800-397-
4209, 301-415-4737 or by email to pdr@nrc.gov.

    Dated at Rockville, Maryland, this 29th day of April 2002.

    For the Nuclear Regulatory Commission.
Richard B. Ennis, Sr.
Project Manager, Section 2, Project Directorate I, Division of 
Licensing, Project Management Office of Nuclear Reactor Regulation.
[FR Doc. 02-11279 Filed 5-6-02; 8:45 am]
BILLING CODE 7590-01-P