[Federal Register: September 20, 2002 (Volume 67, Number 183)]
[Notices]
[Page 59281-59282]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr20se02-71]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG02-183-000, et al.]
Spring Canyon Energy, L.L.C., et al.; Electric Rate and Corporate
Regulation Filings
September 13, 2002.
The following filings have been made with the Commission. The
filings are listed in ascending order within each docket
classification.
1. Spring Canyon Energy, L.L.C.
[Docket No. EG02-183-000]
On September 10, 2002, Spring Canyon Energy, L.L.C. (the Applicant)
whose address is 10440 N. Central Expressway, No. 1400, Dallas, Texas
75231, filed with the Federal Energy Regulatory Commission an
application for determination of exempt wholesale generator status
pursuant to part 365 of the Commission's regulations.
The Applicant states that it will be engaged directly or indirectly
and exclusively in the business of owning and/or operating a 430 MW (up
to 540 MW with duct burners) electric generating facility located near
Mona, Utah and selling electric energy at wholesale. The Applicant
requests a determination that the Applicant is an exempt wholesale
generator under Section 32(a)(1) of the Public Utility Holding Company
Act of 1935.
Comment Date: October 4, 2002.
2. City of Corona v. Southern California Edison Company
[Docket No. EL02-126-000]
Take notice that on September 11, 2002, the City of Corona,
California (Corona) tendered for filing a Complaint and Request for
Fast Track Processing, pursuant to section 206 of the Rules and
Practice and Procedure of the Federal Energy Regulatory Commission,
against Southern California Edison (SCE) alleging violations of
Sections 202, 210, and 212 of the Federal Power Act and the
Commission's regulations implementing such sections.
Corona requests an order directing SCE to promptly process Corona's
Wholesale Distribution Access Tariff application and interconnect
Corona as requested in the application filed with SCE on December 20,
2001, as well as an order to show cause directed against SCE as to why
it should not be found in violation of the Federal Power Act, SCE's own
tariffs, and the Commission's regulations for the actions described in
the Complaint. A copy of the filing was served upon the Parties.
Comment Date: October 3, 2002.
3. Avista Energy, Inc.
[Docket No. ER96-2408-018]
Take notice that on September 9, 2002, Avista Energy, Inc. filed
with the Federal Energy Regulatory Commission its three-year updated
market analysis. Avista Energy, Inc., an indirect, wholly-owned
subsidiary of Avista Corporation, is an electricity and natural gas
trading and marketing company headquartered in Spokane, Washington.
Copies of this filing have been served upon parties on the
Commission's official service list for this docket.
Comment Date: September 30, 2002.
4. Foote Creek II and Foote Creek III
[Docket Nos. ER99-3450-002 and ER99-2769-003]
Take notice that on September 9, 2002, Foote Creek II and Foote
Creek III., filed with the Federal Energy Regulatory Commission
(Commission) their three-year updated market analysis. Foote Creek II
and III has had no changes in ownership, generation capacity,
transmission or market-based rates for this project.
Foote Creek III has changed the name of the utility purchasing the
power the project produces from Public Service Company of Colorado to
ExCel Energy.
Comment Date: September 30, 2002.
5. New York Independent System Operator, Inc.
[Docket Nos. ER00-3591-012, ER00-1969-014, ER00-3038-007, EL00-70-008,
ER02-2081-001]
Take notice that on September 9, 2002, the New York Independent
System Operator, Inc. (NYISO) tendered for filing a compliance filing
in accordance with the Commission's August 9, 2002 order in the above-
captioned proceedings.
A copy of this filing was served upon all signatories to the OATT
and Services Tariff and upon all persons designated on the official
service lists compiled by the Secretary in the above-captioned
proceedings.
Comment Date: September 30, 2002.
6. California Power Exchange Corporation
[Docket No. ER02-2234-003]
Take notice that on September 9, 2002, the California Power
Exchange Corporation made a filing to comply with the Commission's
August 8, 2002 order in this proceeding (100 FERC ] 61,178).
Comment Date: September 30, 2002.
7. PPL Electric Utilities Corporation
[Docket No. ER02-2419-000]
Take notice that on September 4, 2002, PPL Electric Utilities
Corporation (PPL) submitted as a supplement to its initial filing in
the captioned proceeding a one-line diagram of the interconnection
facilities governed by the generator interconnection agreement between
PPL and Bloomsburg Hospital.
Comment Date: September 25, 2002.
8. California Independent System Operator Corporation
[Docket No. ER02-2487-001]
Take notice that on September 10, 2002, the California Independent
System Operator Corporation (ISO) tendered for filing Errata to the
First Revised Service Agreement No. 381 Under ISO Rate Schedule No. 1,
which is a Participating Generator Agreement (PGA) between the ISO and
Metropolitan Water District of Southern California (MWD). The Errata
corrects the requested effective date of the First Revised Service
Agreement No. 381. The ISO filed First Revised Service Agreement No.
381on August 22, 2002 to update Schedule 1 of the PGA. The ISO requests
that the revised PGA be made effective as of August 22, 2002.
The ISO states that this filing has been served on all entities
that are on the official service list for Docket No. ER02-2487-000.
Comment Date: October 1, 2002.
[[Page 59282]]
Standard Paragraph
E. Any person desiring to intervene or to protest this filing
should file with the Federal Energy Regulatory Commission, 888 First
Street, NE, Washington, DC 20426, in accordance with Rules 211 and 214
of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and
385.214). Protests will be considered by the Commission in determining
the appropriate action to be taken, but will not serve to make
protestants parties to the proceeding. Any person wishing to become a
party must file a motion to intervene. All such motions or protests
should be filed on or before the comment date, and, to the extent
applicable, must be served on the applicant and on any other person
designated on the official service list. This filing is available for
review at the Commission or may be viewed on the Commission's Web site
at http://www.ferc.gov using the ``RIMS'' link, select ``Docket
'' and follow the instructions (call 202-208-2222 for
assistance). Protests and interventions may be filed electronically via
the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the
instructions on the Commission's web site under the ``e-Filing'' link.
Magalie R. Salas,
Secretary.
[FR Doc. 02-23859 Filed 9-19-02; 8:45 am]
BILLING CODE 6717-01-P