[Federal Register: March 14, 2002 (Volume 67, Number 50)]
[Notices]               
[Page 11473-11474]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr14mr02-48]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. EC02-54-000, et al.]

 
The New Power Company, et al.; Electric Rate and Corporate 
Regulation Filings

March 4, 2002.
    Take notice that the following filings have been made with the 
Commission. Any comments should be submitted in accordance with 
Standard Paragraph E at the end of this notice.

1. The New Power Company, NewPower Holdings, Inc., Centrica plc

[Docket No. EC02-54-000]

    Take notice that on February 28, 2002, The New Power Company, its 
parent company NewPower Holdings, Inc. and Centrica plc, filed with the 
Federal Energy Regulatory Commission (Commission) a joint application 
pursuant to section 203 of the Federal Power Act for authorization of a 
disposition of jurisdictional facilities whereby Centrica plc will 
indirectly acquire NewPower Holdings, Inc. Applicants request 
confidential treatment of Exhibit I, pursuant to 18 CFR 388.112 of the 
Commission's regulations, for the written instruments associated with 
the proposed disposition. Further, Applicants respectfully request that 
the Commission approve this application on an expedited basis by March 
27, 2002.
    Comment Date: March 21, 2002.

2. Shanghai WEI-Gang Energy Company Ltd.

[Docket No. EG02-70-000]

    Take notice that on February 19, 2002, Shanghai WEI-Gang Energy 
Company Ltd. (Applicant) tendered for filing with the Federal Energy 
Regulatory Commission (Commission) an amended application for 
determination of exempt wholesale generator status pursuant to section 
32(a)(1) of the Public Utility Holding Company Act of 1935. The 
applicant states that it is a Sino-foreign cooperative joint venture 
that is engaged directly and exclusively in developing, owning, and 
operating a gas-fired 50 MW simple cycle power plant in Shanghai, 
China, which will be an eligible facility.
    Comment Date: March 25, 2002.

3. American Transmission Company LLC

[Docket No. ER02-529-001]

    Take notice that on February 27, 2002, American Transmission 
Company LLC (ATCLLC) tendered for filing, in compliance with the 
Federal Energy Regulatory Commission's (Commission) January 30, 2002 
order, a Revised Generation-Transmission Interconnection Agreement with 
Cloverland Electric Cooperative, which is designated as Revised Service 
Agreement No. 220. ATCLLC requests an effective date of June 29, 2001.
    Comment Date: March 20, 2002.

4. RAMCO, Inc.

[Docket No. ER01-1916-001]

    Take notice that on February 28, 2002, RAMCO, Inc. (RAMCO) filed a 
Notice of Change in Status with the Federal Energy Regulatory 
Commission (Commission) in accordance with the delegated letter order 
issued June 26, 2001 in RAMCO, Inc., Docket No. ER01-1916-000, 
accepting for filing RAMCO's marked-based rate tariff. The Notice of 
Change in Status reports that PG&E Dispersed Power Corporation will 
purchase 100% of the ownership shares of RAMCO. Comment Date: March 21, 
2002.

5. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER02-1164-000]

    Take notice that on February 28, 2002, pursuant to Section 205 of 
the Federal Power Act and Section 35.13 of the Federal Energy 
Regulatory Commission's (Commission) Regulations, 18 CFR 35.13, the 
Midwest Independent Transmission System Operator, Inc. (Midwest ISO) 
submitted for filing a Service Agreements for the transmission service 
requested by Dayton Power and Light Company--DP&L Power Services.
    A copy of this filing was sent to Dayton Power and Light Company--
DP&L Power Services.
    Comment Date: March 21, 2002.

6. Connexus Energy

[Docket No. ER02-1165-000]

    Take notice that on February 28, 2002, Connexus Energy submitted 
for filing with the Federal Energy Regulatory Commission (Commission) 
revised sheets to Connexus Energy's Electric Rate Schedule FERC No. 1. 
Connexus Energy states that the revised sheets effect minor rate 
changes under Connexus Energy's contract with Elk River Municipal 
Utilities.
    Connexus Energy requests waiver of the Commission's notice 
requirement to allow a March 1, 2002 effective date.
    Comment Date: March 21, 2002.

7. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER02-1167-000]

    Take notice that on February 28, 2002, pursuant to section 205 of 
the Federal Power Act and section 35.13 of the Federal Energy 
Regulatory Commission's (Commission) Regulations, 18 CFR 35.13, the 
Midwest Independent Transmission System Operator, Inc. (Midwest ISO) 
submitted for filing a Service Agreements for the transmission service 
requested by Indianapolis Power & Light Company.
    A copy of this filing was sent to Indianapolis Power & Light 
Company. Comment Date: March 21, 2002.

8. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER02-1168-000]

    Take notice that on February 28, 2002, pursuant to Section 205 of 
the Federal Power Act and Section 35.13 of the

[[Page 11474]]

Federal Energy Regulatory Commission's (Commission) Regulations, 18 CFR 
35.13, the Midwest Independent Transmission System Operator, Inc. 
(Midwest ISO) submitted for filing a Service Agreements for the 
transmission service requested by New Power Company.
    A copy of this filing was sent to New Power Company.
    Comment Date: March 21, 2002.

9. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER02-1169-000]

    Take notice that on February 28, 2002, pursuant to section 205 of 
the Federal Power Act and section 35.13 of the Federal Energy 
Regulatory Commission's (Commission) regulations, 18 CFR 35.13, the 
Midwest Independent Transmission System Operator, Inc. (Midwest ISO) 
submitted for filing a Service Agreements for the transmission service 
requested by Western Area Power Administration-UGP Marketing.
    A copy of this filing was sent to Western Area Power 
Administration-UGP Marketing.
    Comment Date: March 21, 2002.

10. Midwest Independent Transmission System Operator, Inc.

[Docket No. ER02-1170-000]

    Take notice that on February 28, 2002, pursuant to section 205 of 
the Federal Power Act and section 35.13 of the Federal Energy 
Regulatory Commission's (Commission) Regulations, 18 CFR 35.13, the 
Midwest Independent Transmission System Operator, Inc. (Midwest ISO) 
submitted for filing a Service Agreements for the transmission service 
requested by Minnkota Power Cooperative.
    A copy of this filing was sent to Minnkota Power Cooperative.
    Comment Date: March 21, 2002.

Standard Paragraph

    E. Any person desiring to be heard or to protest such filing should 
file a motion to intervene or protest with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in 
accordance with rules 211 and 214 of the Commission's rules of practice 
and procedure (18 CFR 385.211 and 385.214). All such motions or 
protests should be filed on or before the comment date. Protests will 
be considered by the Commission in determining the appropriate action 
to be taken, but will not serve to make protestants parties to the 
proceeding. Any person wishing to become a party must file a motion to 
intervene. Copies of this filing are on file with the Commission and 
are available for public inspection. This filing may also be viewed on 
the web at http://www.ferc.gov using the ``RIMS'' link, select 
``Docket#'' and follow the instructions (call 202-208-2222 for 
assistance). Comments, protests and interventions may be filed 
electronically via the Internet in lieu of paper. See, 18 CFR 
385.2001(a)(1)(iii) and the instructions on the Commission's web site 
under the ``e-Filing'' link.

Magalie R. Salas,
Secretary.
[FR Doc. 02-6101 Filed 3-13-02; 8:45 am]
BILLING CODE 6717-01-P