[Federal Register: July 31, 2002 (Volume 67, Number 147)]
[Notices]               
[Page 49685-49686]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr31jy02-52]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER01-2905-001, et al.]

 
Xcel Energy Services, Inc., et al.; Electric Rate and Corporate 
Regulation Filings

July 24, 2002.
    The following filings have been made with the Commission. The 
filings are listed in ascending order within each docket 
classification.

1. Xcel Energy Services, Inc.

[Docket No. ER01-2905-001]

    Take notice that on July 15, 2002, Xcel Energy Services, Inc. 
(Xcel) tendered for filing with the Federal Energy Regulatory 
Commission (Commission), a response to the letter issued by the 
Commission in the captioned docket on June 14, 2002.
    Comment Date: August 5, 2002.

2. PECO Energy Company

[Docket No. ER02-2341-000]

    Take notice that on July 18, 2002 PECO Energy Company (PECO) 
submitted for filing an Interconnection Agreement by and between PECO 
and Visteon Corporation (Visteon) for Generation Interconnection and 
Parallel Operation, designated as Service Agreement No. 703 under PJM 
Interconnection, L.L.C.'s FERC Electric Tariff, Fourth Revised Volume 
No. 1, to be effective on July 1, 2002. Copies of this filing were 
served on Visteon and PJM.
    Comment Date: August 8, 2002.

3. PPL Montana, LLC

[Docket No. ER02-2342-000]

    Take notice that on July 19, 2002, PPL Montana, LLC (PPL Montana) 
filed notices of termination of the Colstrip Unit Number 3 Wholesale 
Transition Service Agreement between PPL Montana and The Montana Power 
Company (now NorthWestern Energy, L.L.C.), designated as Rate Schedule 
FERC No. 1, and the Non Colstrip Unit Number 3 Wholesale Transition 
Service Agreement between PPL Montana and The Montana Power Company 
(now NorthWestern Energy, L.L.C.), designated as Rate Schedule FERC No. 
2. Both rate schedules terminated by their own terms.
    Notices of the termination have been served upon NorthWestern 
Energy, L.L.C.
    Comment Date: August 9, 2002.

4. California Independent System Operator Corporation

[Docket No. ER02-2343-000]

    Take notice that on July 19, 2002, the California Independent 
System Operator Corporation (ISO), tendered for filing a notice of 
termination of the Restated Interim Agreement (RIA) among the ISO, 
Sacramento Municipal Utility District (SMUD), and Pacific Gas and 
Electric Company (PG&E), for acceptance by the Federal Energy 
Regulatory Commission (Commission). The ISO requests that the 
termination of the RIA be made effective as of June 13, 2002, the date 
SMUD became a Control Area operator, as specified in Section 2.1(2) of 
the RIA.
    The ISO states that this filing has been served on SMUD, PG&E, the 
Public Utilities Commission of the State of California, and the persons 
listed on the service list for Docket No. ER00-3278-000.
    Comment Date: August 9, 2002.

5. Southern California Edison Company

[Docket No. ER02-2344-000]

    Take notice that on July 19, 2002, Southern California Edison 
Company (SCE) tendered for filing revised sheets, and a letter 
agreement as added sheets to the Amended & Restated Eldorado System 
Operating Agreement (Agreement) between SCE and Nevada Power Company 
(NPC), Salt River Project Agricultural Improvement and Power District 
(SRP), and the Department of Water and Power of the City of Los Angeles 
(LADWP).
    The purpose of the revised sheets is to correct a minor 
typographical error. The purpose of the letter agreement is to 
supplement the terms relating to Capital Improvements as set forth in 
Section 17 of the Agreement, under which 500 kV circuit breakers in the 
Eldorado Substation will be either replaced or upgraded. Further, the 
letter agreement provides the terms for either replacing or upgrading 
SCE's 500 kV series capacitors at the Eldorado Substation. Copies of 
this filing were served upon the Public Utilities Commission of the 
State of California, NPC, SRP, and LADWP.
    Comment Date: August 9, 2002.

6. PJM Interconnection, L.L.C.

[Docket No. ER02-2345-000]

    Take notice that on July 19, 2002, PJM Interconnection, L.L.C. 
(PJM), submitted amendments to Schedule 2 of the PJM Open Access 
Transmission Tariff to include the annual and monthly revenue 
requirements for Reactive Supply and Voltage Control from Generation 
Sources Service for Bethlehem Steel Corporation (Bethlehem) approved by 
the Commission in Docket No. ER02-1894.
    Consistent with the effective date of the Federal Energy Regulatory 
Commission's approval of Bethlehem's revenue requirements in Docket No. 
ER02-1894, PJM requests an effective date of July 1, 2002 for the 
revisions.
    Copies of this filing have been served on all persons on the 
service list in Docket No. ER02-1326-000, all PJM members, and the 
state electric utility commissions in the PJM region.
    Comment Date: August 9, 2002.

7. Louis Dreyfus Electric Power Inc.

[Docket No. ER02-2355-000]

    Take notice that on July 17, 2002, Louis Dreyfus Electric Power 
Inc. (LDEP), tendered for filing a notice of cancellation of its Rate 
Schedule FERC No. 1.
    Comment Date: August 7, 2002.

Standard Paragraph

    E. Any person desiring to intervene or to protest this filing 
should file with the Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426, in accordance with rules 211 and 214 
of the Commission's Rules of Practice and Procedure (18 CFR 385.211 and 
385.214). Protests will be considered by the Commission in determining 
the appropriate action to be taken, but will not serve to make 
protestants parties to the proceeding. Any person wishing to become a 
party must file a motion to intervene. All such motions or protests 
should be filed on or before the comment date, and, to the extent 
applicable, must be served on the applicant and on any other person 
designated on the official service list. This filing is available for 
review at the Commission or may be viewed on the Commission's web site 
at http://www.ferc.gov using the ``RIMS'' link, select ``Docket #'' and 
follow the instructions (call 202-208-2222 for assistance). Protests 
and interventions may be filed electronically via the Internet in lieu 
of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions

[[Page 49686]]

on the Commission's web site under the ``e-Filing'' link.

Magalie R. Salas,
Secretary.
[FR Doc. 02-19307 Filed 7-30-02; 8:45 am]
BILLING CODE 6717-01-P