[Federal Register: November 13, 2000 (Volume 65, Number 219)]
[Notices]               
[Page 67739-67740]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr13no00-100]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP99-301-009]

 
ANR Pipeline Company; Notice of Proposed Changes in FERC Gas 
Tariff

November 6, 2000.
    Take notice that on October 31, 2000, ANR Pipeline Company (ANR) 
tendered for filing, as part of its FERC Gas Tariff, Second Revised 
Volume No. 1, the

[[Page 67740]]

following tariff sheets proposed to become effective November 1, 2000:

First Revised Sheet No. 14B
First Revised Sheet No. 14F
First Revised Sheet No. 14L

    ANR is filing the attached tariff sheets to reflect a change in the 
negotiated rate contracts with Wisconsin Public Service Corporation 
(WPSC). WPSC is increasing its MDQ under its Marshfield contract 5500 
by 68 dth/d, and making a corresponding decrease of 68 dth/d to its 
Joliet Hub contract 104403. Also, WPSC is adjusting its previous annual 
MDQ level associated with NNS contract 99515, to provide for a seasonal 
split it the MDQ. Therefore, on an annual basis, there is no change in 
level of NNS service. ANR requests that the Commission grant ANR any 
waivers of the Commission's regulations which are necessary in order to 
make these tariff sheets effective as of November 1, 2000, and to the 
extent necessary, moves pursuant to 18 CFR 154.7(a)(9) for the tariff 
sheets to go into effect on said date. Additionally, ANR requests all 
such further relief as is appropriate.
    ANR states that a copy of this filing is being mailed to the 
affected shipper and to each of ANR's FERC Gas Tariff, Second Revised 
Volume No. 1 and Original Volume No. 2 customers, and interested State 
Commissions.
    Any person desiring to be heard or to protest said filing should 
file a motion to intervene or a protest with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in 
accordance with sections 385.214 or 385.211 of the Commission's Rules 
and Regulations. All such motions or protests must be filed in 
accordance with section 154.210 of the Commission's Regulations. 
Protests will be considered by the Commission in determining the 
appropriate action to be taken, but will not serve to make protestants 
parties to the proceedings. Any person wishing to become a party must 
file a motion to intervene. Copies of this filing are on file with the 
Commission and are available for public inspection in the Public 
Reference Room. This filing may be viewed on the web at http://
www.ferc.fed.us/online/rims.htm (call 202-208-2222 for assistance). 
Comments and protests may be filed electronically via the internet in 
lieu of paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on 
the Commission's web site at http://www.ferc.fed.us/efi/doorbell.htm.

David P. Boergers,
Secretary.
[FR Doc. 00-28935 Filed 11-9-00; 8:45 am]
BILLING CODE 6717-01-M