DEPARTMENT OF TRANSPORTATION

Coast Guard

33 CFR Part 117

[CGD07-01-009]

 
Drawbridge Operation Regulations; Brorein Street Bridge, Across 
the Hillsborough River, Tampa, FL

AGENCY: Coast Guard, DOT.

ACTION: Notice of temporary deviation from regulations.

-----------------------------------------------------------------------

SUMMARY: The Commander, Seventh Coast Guard District, has approved a 
temporary deviation from the regulations governing the operation of the 
Brorein Street Bridge across the Hillsborough River, mile 0.16, Tampa, 
Florida. This deviation allows the drawbridge to remain closed to 
navigation for five days, from 7 a.m. on February 26, 2001 until 12 
p.m. on March 2, 2001. This temporary deviation is required to allow 
the bridge owner to safety complete removal of asbestos from the 
tender's control room and from the electrical wiring of the bridge 
operating system.

DATES: This deviation is effective from February 26, 2001 to March 2, 
2001.

FOR FURTHER INFORMATION CONTACT: Mr. Barry Dragon, Chief, Operations 
Section, Seventh Coast Guard District, Bridge Section at (305) 415-
6743.

SUPPLEMENTARY INFORMATION: The Brorein Street Bridge across the 
Hillsborough River at Tampa, has a vertical clearance of 15 feet above 
mean high water (MHW) measured at the fenders in the closed position 
with a horizontal clearance of 80 feet. On January 31, 2001, Acutec, 
Inc., acting as an agent for the drawbridge owner, requested a 
deviation from the current operating regulation in 33 CFR 117.291(a) 
which requires the drawbridge to open on signal if at least two hours 
notice is given. This temporary deviation was requested to allow 
necessary repairs to the drawbridge in a critical time sensitive 
manner.
    The District Commander has granted a temporary deviation from the 
operating requirements listed in 33 CFR 117.291(a) for the purpose of 
repair completion of the drawbridge. Under this deviation, the Brorein 
Street Bridge need not open from 7 a.m. February 26, 2001 until 12 p.m. 
March 2, 2001. The deviation is effective for five days.

    Dated: February 1, 2001.
Greg E. Shapley,
Chief, Bridge Administration, Seventh Coast Guard District.
[FR Doc. 01-3374 Filed 2-8-01; 8:45 am]