[Federal Register: December 31, 2001 (Volume 66, Number 250)]
[Notices]
[Page 67552-67553]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr31de01-62]
=======================================================================
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Agency Information Collection Activities: Proposed Collection;
Comment Request
AGENCY: Nuclear Regulatory Commission (NRC).
ACTION: Notice of pending NRC action to submit an information
collection request to OMB and solicitation of public comment.
-----------------------------------------------------------------------
SUMMARY: The NRC is preparing a submittal to OMB for review of
continued approval of information collections under the provisions of
the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35).
Information pertaining to the requirement to be submitted:
1. The title of the information collection: 10 CFR Part 54,
``Requirements for Renewal of Operating Licenses for Nuclear Power
Plants.''
2. Current OMB approval number: 3150-0155.
3. How often the collection is required: One-time submission with
application for renewal of an operating license for a nuclear power
plant and occasional collections for holders of renewed licenses.
4. Who is required or asked to report: Commercial nuclear power
plant licensees who wish to renew their operating licenses.
5. The number of annual respondents: 6 respondents annually based
on an estimate of the receipt of 19 new renewal applications over three
years.
6. The number of hours needed annually to complete the requirement
or request: Approximately 432,333 hours (405,333 hours one-time
reporting burden and 27,000 hours recordkeeping burden).
7. Abstract: 10 CFR Part 54 of the NRC regulations, ``Requirements
for Renewal of Operating Licensees for Nuclear Power Plants,''
specifies the procedures, criteria, and standards governing nuclear
power plant license renewal, including information submittal and
recordkeeping requirements, so that the NRC may make determinations
that extension of the license term will continue to ensure the health
and safety of the public.
Submit, by March 1, 2002, comments that address the following
questions:
1. Is the proposed collection of information necessary for the NRC
to properly perform its functions? Does the information have practical
utility?
2. Is the burden estimate accurate?
3. Is there a way to enhance the quality, utility, and clarity of
the information to be collected?
4. How can the burden of the information collection be minimized,
including the use of automated collection techniques or other forms of
information technology?
A copy of the draft supporting statement may be viewed free of
charge at the NRC Public Document Room, One White Flint North, 11555
Rockville Pike, Room O-1 F23, Rockville, MD 20852. OMB clearance
requests are available at the NRC worldwide web site: http://
www.nrc.gov/NRC/PUBLIC/OMB/index.html. The document will be available
on the NRC home page site for 60 days after the signature date of this
notice.
Comments and questions about the information collection
requirements may be directed to the NRC Clearance Officer, Brenda Jo.
Shelton, U.S. Nuclear Regulatory Commission, T-6 E6, Washington, DC
20555-0001, by telephone at 301-415-7233, or by
[[Page 67553]]
Internet electronic mail at BJS1@NRC.GOV.
Dated at Rockville, Maryland, this 20th day of December 2001.
For the Nuclear Regulatory Commission.
Brenda Jo. Shelton,
NRC Clearance Officer, Office of the Chief Information Officer.
[FR Doc. 01-32060 Filed 12-28-01; 8:45 am]
BILLING CODE 7590-01-P