[Federal Register: July 27, 2001 (Volume 66, Number 145)]
[Notices]
[Page 39157-39158]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr27jy01-58]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application for Amendment of License and Soliciting
Comments, Motions To Intervene and Protests
July 23, 2001.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Amendment of license.
b. Project No.: 2192-009.
c. Date Filed: June 20, 2001.
d. Applicant: Consolidated Water Power Company.
e. Name of Project: Biron Project.
f. Location: On Halladay Creek, on the Wisconsin River, near the
town of Plover, Portage County, Wisconsin. The project does not utilize
federal or tribal lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r)
h. Applicant Contact: Mr. Mark Anderson, Consolidated Water Power
Company, P.O. Box 8050, Wisconsin Rapids, WI 54495-8050, (715) 422-
3927.
i. FERC Contact: Michael Spencer, michael.spencer@FERC.fed.us,
(202) 219-2846.
j. Deadline for filing comments, motions to intervene and protests:
60 days from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
David P. Boergers, Secretary Federal Energy Regulatory Commission, 888
First Street, NE., Washington, DC 20426.
The Commission's Rules of Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Project: The licensee requests an amendment to
its license to: (1) Transfer to the Mirant Portage County a parcel of
project land containing a total of 1.0 acres for construction of a
pumping facility and 36-inch-diameter intake pipe; and (2) grant an
easement to the Mirant Portage County for a 7.2 million gallons per day
(MGD) maximum water withdrawal rate through the facility. Of the 7.2
MGD, up to 2.0 MGD, would be returned after use, to the point of
withdrawal. The water would be used for cooling purposes at the
proposed combined cycle generating plant.
l. Locations of the application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference Room, located at 888 First Street, NE., Room 2A, Washington,
D.C. 20246, or by calling (202) 208-1371. The application may be viewed
on the web at http://www.ferc.gov using the ``RIMS'' link-select
``Docket#'' and follow the instructions (call (202) 208-2222 for
assistance). A copy is also available for inspection and reproduction
at the address in item h. above.
[[Page 39158]]
m. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
Filing and Service of Responsive Documents--Any filings must bear
in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS FOR
TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. A copy of any motion to intervene must also be
served upon each representative of the Applicant specified in the
particular application.
Agency Comments--Federal, state, and local agencies are invited to
file comments on the described application. A copy of the application
may be obtained by agencies directly from the Applicant. If an agency
does not file comments within the time specified for filing comments,
it will be presumed to have no comments. One copy of an agency's
comments must also be sent to the Applicant's representatives.
Comments, protests and interventions may be filed electronically
via the Internet in lieu of paper. See 18 CFR 385.2001(a)(1)(iii) and
the instructions on the Commission's web site under the ``e-filing''
link.
David P. Boergers,
Secretary.
[FR Doc. 01-18776 Filed 7-26-01; 8:45 am]
BILLING CODE 6717-01-P