[Federal Register: August 10, 2001 (Volume 66, Number 155)]
[Notices]
[Page 42215-42216]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr10au01-65]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6620-7]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information, (202) 564-7167 or www.epa.gov/oeca/ofa.
Weekly Receipt of Environmental Impact Statements
Filed July 30, 2001 Through August 03, 2001
Pursuant to 40 CFR 1506.9.
EIS No. 010288, DRAFT EIS, FHW, MS, East Harrison County Connector
Construction, I-10 to US 90, Funding, US Army COE and US Coast Guard
Permits Issuance and Possible Transfer of Federal Lands, Harrison
County, MS, Comment Period Ends: September 24, 2001, Contact: Cecil W.
Vick, Jr (601) 965-4217.
EIS No. 010289, DRAFT EIS, COE, PA, Dents Run Watershed Ecosystem
Restoration, Construction and Operation of Six Acid Mine Drainage
Abatement Projects, Implementation, Benezette Township, Susquehana
River Basin, Elk County, PA, Comment Period Ends: September 24, 2001,
Contact: Greg Nielson (410) 962-8111. This document is available on the
Internet at: www.nab.usace.army.mil/projects/civil.htm.
EIS No. 010290, DRAFT EIS, FHW, MO, Interstate 70 Corridor
Improvements, Kansas City to St. Louis, Funding, US Army COE Section
404 and 10 and US Coast Guard Section 9 Permits Issuance, several
counties, MO, Comment Period Ends: September 25, 2001, Contact: Don
Neumann (573) 638-2620.
EIS No. 010291, DRAFT EIS, UAF, MT, Montana Air National Guard Air-to-
Ground Training Range Development for Use by the 120th Fighter Wing
(120th FW), Implementation, Phillips and Blaine Counties, MT, Comment
Period Ends: September 24, 2001, Contact: Maj. Tammy Mitnik (301) 836-
8636.
EIS No. 010292, DRAFT EIS, AFS, AK, Helicopter Landing Tours on the
Juneau Icefield 2002 to 2006, Combination Fixed-Wing and Helicopter
Landing Tour Operations to Antler Glacier Lake, Special Use Permits
Issuance, Tongass National Forest, City and Borough of Juneau, AK,
Comment Period Ends: September 24, 2001, Contact: Laurie Thorpe (907)
790-7439. This document is available on the Internet at: www.fs.fed.us/
r10/tongass/index.html.
EIS No. 010293, FINAL EIS, FHW, IN, IN-145 New Road Construction,
Funding, IN-37 and the existing I-64 Interchange near St. Croix in
Perry County to the east junction of IN-64 and IN-145 in Crawford
County, IN, Wait Period Ends: September 10, 2001, Contact: Robert Dirks
(317) 915-7492.
EIS No. 010294, DRAFT EIS, FRC, NY, Eastchester Project, Natural Gas
Pipeline and Associated Facilities, (Docket Nos. CP00-232-001)
Construction, Operation and Maintenance, from Northport Long Island to
the Bronx, Approval and US Army COE Section 10 and 404
[[Page 42216]]
Permits Issuance, Bronx Borough, NY, Comment Period Ends: September 24,
2001, Contact: John Schnagl (202) 219-2661. This document is available
on the Internet at: www.ferc.gov.
EIS No. 010295, DRAFT EIS, AFS, OR, WA, Plentybob Ecosystem Restoration
Project, Restoration Activities include: Prescribed Fire, Timber
Harvest, Road Obliteration, Hardwood Planting and Noxious Weed
Treatment, Implementation, Walla Walla Ranger District, Umatilla
National Forest, Umatilla County, OR, Comment Period Ends: September
24, 2001, Contact: Dennis Sedam (509) 522-6050.
EIS No. 010296, FINAL EIS, USA, MD, Fort George G. Meade Future
Development and Operations of a New Administrative and Support
Buildings, Anne Arundel and Howard Counties, MD, Wait Period Ends:
September 10, 2001, Contact: Jim Gebhardt (301) 677-9365.
EIS No. 010297, FINAL EIS, AFS, MT, Lolo National Forest, Big Game
Winter Range and Burned Area Management, Restoration, Prevention and
Cooperation, Implementation, Missoula, Lake, Mineral, Sanders, Granite,
Powell, Lewis and Clark, Flathead and Ravalli Counties, MT, Comment
Period Ends: September 10, 2001, Contact: Andy Kulla (406) 329-3962.
EIS No. 010298, FINAL EIS, TVA, TN, AL, Guntersville Reservoir Land
Management Plan, Implementation, Proposal to Update a 1983 Land
Allocation Plan, Jackson and Marshall Counties, AL and Marion County,
TN, Wait Period Ends: September 10, 2001, Contact: Nancy R. Greer (256)
571-4289.
Dated: August 7, 2001.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 01-20123 Filed 8-9-01; 8:45 am]
BILLING CODE 6560-50-P