[Federal Register: October 9, 2001 (Volume 66, Number 195)]
[Notices]               
[Page 51427-51428]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr09oc01-82]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 
Notice of Application Accepted for Filing and Soliciting Motions 
To Intervene, Protests, Comments, Recommendations, and Terms and 
Conditions

October 2, 2001.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
    a. Type of Application: Conduit Exemption.
    b. Project No.: 12119-000.
    c. Date filed: September 6, 2001.
    d. Applicant: PowerWheel Associates.
    e. Name of Project: PowerWheel Demonstration Project.
    f. Location: In Kern County, California. The project would be 
located on Semitropic Water Storage District's (SWSD) main intake canal 
at Station 70+50. The man-made canal's proximate source of water where 
the project will be located is the California Aqueduct at Station 
2157+22. The project would not occupy federal or tribal lands.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a) -825(r).
    h. Applicant Contact: Mr. Kenneth R. Broome, Managing Partner, 
PowerWheel Associates, 100 Rocky Creek Road, Woodside, CA 94062, (650) 
529-1810.
    i. FERC Contact: Regina Saizan, (202) 219-2673.
    j. Status of Environmental Analysis: This application is ready for 
environmental analysis at this time--see the following paragraphs about 
filing responsive documents.
    k. Deadline for filing motions to intervene, protests and comments: 
(November 3, 2001).
    All documents (original and eight copies) should be filed with: 
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE., Washington, DC 20426. Comments, protests and 
interventions may be filed electronically via the Internet in lieu of 
paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the 
Commission's web site under the ``e-Filing'' link.
    Please include the Project Number (12119-000) on any comments, 
protests, or motions filed.
    The Commission's Rules of Practice and Procedure require all 
interveners filing a document with the Commission to serve a copy of 
that document on each person in the official service list for the 
project. Further, if an intervener files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    l. Description of Project: The project would consist of a 
waterwheel, 7 feet in external diameter, 3\1/2\ feet in internal 
diameter and 14\1/2\ feet long, to be operated in a ``run-of-conduit'' 
mode with whatever flow is available and required to satisfy SWSD 
customer needs. It will have one 75-kW generating unit installed at the 
sloping drop structure located at Station 70+50. The average annual 
generation would be 328,500 kWh.
    m. Available Locations of Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 208-1371. Copies of this filing are on 
file with the Commission and are available for public inspection. This 
filing may also be viewed on the web at http://www.ferc.gov using the 
``RIMS'' link, select ``Docket#'' and follow the instructions (call 
202-208-2222 for assistance). A copy is also available for inspection 
and reproduction at the address in item h above.
    n. Development Application--Any qualified applicant desiring to 
file a competing application must submit to the Commission, on or 
before the specified deadline date for the particular application, a 
competing development application, or a notice of intent to file such 
an application. Submission of a timely notice of intent allows an 
interested person to file the competing development application no 
later than 120 days after the specified deadline date for the 
particular application. Applications for preliminary permits will not 
be accepted in response to this notice.
    o. Notice of Intent--A notice of intent must specify the exact 
name, business address, and telephone number of the prospective 
applicant, and must include an unequivocal statement of intent to 
submit, if such an application may be filed, either a preliminary 
permit application or a development application (specify which type of 
application). A notice of intent must be served on the applicant(s) 
named in this public notice.
    p. Protests of Motions to Intervene--Anyone may submit a protest or 
a motion to intervene in accordance with the requirements of Rules of 
Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In 
determining the appropriate action to take, the Commission will 
consider all protests filed, but only those who file a motion to 
intervene in accordance with the Commission's Rules may become a party 
to the proceeding. Any protests or motions to intervene must be 
received on or before the specified deadline date for the particular 
application.
    q. Filing and Service of Responsive Documents--The application is 
ready for environmental analysis at this time, and the Commission is 
requesting comments, reply comments, recommendations, terms and 
conditions, and prescriptions.
    r. Anyone may obtain an extension of time for these deadlines from 
the Commission only upon a showing of good cause or extraordinary 
circumstances in accordance with 18 CFR 385.2008.
    s. All filings must (1) bear in all capital letters the title 
``PROTEST'', ``MOTION TO INTERVENE'', ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION'', ``COMPETING APPLICATION'', `` COMMENTS'', `` 
REPLY COMMENTS'', ``RECOMMENDATIONS'', ``TERMS AND CONDITIONS'', or 
``PRESCRIPTIONS'; (2) set forth in the heading the name of the 
applicant and the project number of the application to which the filing 
responds; (3) furnish the name, address, and telephone number of the 
person protesting or intervening; and (4) otherwise comply with the 
requirements of 18 CFR 385.2001 through 385.2005. All comments, 
recommendations, terms and conditions or prescriptions must set forth 
their evidentiary basis and otherwise comply with the requirements of 
18 CFR 4.34(b). Agencies may obtain copies of the application directly 
from the applicant. Any of these documents must be filed by providing 
the original and the number of copies required by the Commission's 
regulations to: The Secretary, Federal Energy Regulatory Commission, 
888 First Street, NE., Washington, DC 20426. A copy of any protest or 
motion to intervene must be served upon each representative of the 
applicant specified in the particular application. A copy of all other 
filings in reference to this application must be

[[Page 51428]]

accompanied by proof of service on all persons listed in the Service 
list prepared by the Commission in this proceeding, in accordance with 
18 CFR 4.34(b) and 385.2010.

David P. Boergers,
Secretary.
[FR Doc. 01-25203 Filed 10-5-01; 8:45 am]
BILLING CODE 6717-01-P