[Federal Register: June 22, 2001 (Volume 66, Number 121)]
[Notices]               
[Page 33537-33538]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr22jn01-45]                         

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6619-2]

 
Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or www.epa.gov/oeca/ofa

Weekly Receipt of Environmental Impact Statements

    Filed June 11, 2001 Through June 15, 2001
    Pursuant to 40 CFR 1506.9.

EIS No. 010214, Draft EIS, HUD, CA, West Hollywood Gateway Project,

[[Page 33538]]

Constructing from Santa Monica Boulevard, Romaine Street LaBrea Avenue 
and Formosa Avenue, Public/Private Partnership, City of West Hollywood, 
Los Angeles County, CA, Due: August 6, 2001, Contact: DeAnn Johnson 
(323) 890-7186.
EIS No. 010215, Draft EIS, COE, CA, Port of Long Beach Pier J South 
Terminal, Redevelopment of Two Existing Marine Container Terminal into 
One Terminal, COE Section 404, 401 and 10 Permits, Comment Period Ends: 
August 6, 2001, Contact: Aaron O. Allen (619) 294-9400.
EIS No. 010216, Final EIS, NPS, CA, NV, CA, NV, Death Valley National 
Park General Management Plan, Implementation, Mojave Desert, Inyo and 
San Bernardino Counties, CA and Nye and Esmeralda Counties, NV, Wait 
Period Ends: July 23, 2001, Contact: Dennis Shramm (760) 255-8840.
EIS No. 010217, Final EIS, NPS, CA, Mojave National Preserve General 
Management Plan, Implementation, San Bernardino County, CA, Wait Period 
Ends: July 23, 2001, Contact: Dennis Schamm (760) 255-8840.
EIS No. 010218, Final EIS, AFS, MI, Plantation Lakes Vegetation 
Management Project, Implementation, Ottawa National Forest, Kenton and 
Ontonagon Ranger Districts, Houghton County, MI, Wait Period Ends: July 
23, 2001, Contact: Karen Stevens (906) 932-1330.
EIS No. 010219, Draft EIS, FHW, MO, U.S. Route 67 Corridor Project, 
Improvements from South of Fredericktown to the South of Neelyville, 
Madison, Wayne and Butler Counties, MO, Comment Period Ends: August 6, 
2001, Contact: Donald Newmann (573) 636-7104.
EIS No. 010220, Draft EIS, NRC, FL, Generic EIS--License Renewal of 
Nuclear Power Plants, Supplement 5 Turkey Point Units 3 and 4 (NUREG-
1437), Operating License Renewal, Biscayne Bay, Miami-Dade County, FL, 
Comments Period Ends: August 6, 2001, Contact: James H. Wilson (301) 
415-1108.
EIS No. 010221, Final EIS, JUS, WA, Tacoma/Seattle Area Detention 
Center, Construction and Leasing, Pierce County, WA, Wait Period Ends: 
July 23, 2001, Contact: Eric Verwers (817) 978-0202.
EIS No. 010222, Draft EIS, DOE, AZ, ID, NV, OR, WY, CA, MT, NM, UT, 
Fish and Wildlife Implementation Plan, To Implement and Fund a Policy 
Directions for Fish and Wildlife Mitigation and Recovery, Pacific 
Northwest, AZ, CA, ID, MT, NV, NM, OR, UT, WY and British Columbia, 
Comment Period Ends: August 6, 2001, Contact: Charles Alton (503) 230-
3900.
EIS No. 010223, Draft EIS, DOE, AZ, Big Sandy Energy Project, 
Construction and Operation a 720-megawatt (MW) Natural Gas-Fire 
Combined-Cycle Power Plants, Right-of-Way Grant, Mohave County, AZ, 
Comment Period Ends: August 6, 2001, Contact: John Holt (602) 352-2592.
EIS No. 010224, Draft EIS, AFS, MT, Pink Stone Fire Recovery and 
Associated Activities, To Reduce Existing and Expected Future Fuel 
Accumulations, Kootena National Forest, Rexford Ranger District, 
Lincoln County, MT, Comment Period Ends: August 6, 2001, Contact: Ron 
Komac (406) 296-2536.
EIS No. 010225, Final EIS, FTA, CA, ADOPTION--64-Acre Tract Intermodal 
Transit Center, Construction and Operation Lake, Tahoe Basin Management 
Unit, Tahoe City, Placer County, CA, Contact: Jerome Wiggins (415) 744-
3115. The US Department of Transportation's, Federal Transit 
Administration (DOT/FTA) has ADOPTED the US Department of 
Agricultural's, Forest Service FEIS #000355, filed on 10/12/2000 and 
appearing in the FR on 10/20/2000. DOT/FTA was a Cooperating Agency for 
the above project. Recirculation of the FEIS is not necessary under 
Section 1506.3(c) of CEQ Regulations.

Amended Notices

EIS No. 010159, Draft SUPPLEMENT, DOE, NV, Geologic Repository for the 
Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste, 
Construction, Operation, Monitoring and Eventually Closing a Geologic 
Repository at Yucca Mountain, Updated and Additional Information, Nye 
County, NV, Due: July 6, 2001, Contact: Jane R. Summerson (702) 794-
1493. Revision of FR Notice Published on 5/11/2001: CEQ Review Period 
Ending 6/25/2001 has been Extended to 7/6/2001.
EIS No. 010193, Final EIS, FAA, Programmatic EIS--Commercial Launch 
Vehicles, Implementation, Issuing a Launch License, Due: July 2, 2001, 
Contact: Michon Washington (202) 267-9305. Revision of FR notice 
published on 6/1/2001: CEQ Wait Period Ending 7/20/2001 has been 
Corrected to 7/2/2001.

    Dated: June 19, 2001.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 01-15775 Filed 6-21-01; 8:45 am]
BILLING CODE 6560-50-U