[Federal Register: May 22, 2001 (Volume 66, Number 99)]
[Notices]               
[Page 28161]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr22my01-61]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 
Notice of Application Tendered for Filing With the Commission, 
Soliciting Additional Study Requests, and Establishing Procedures for 
Relicensing and a Deadline for Submission of Final Amendments

May 16, 2001.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: New Minor License.
    b. Project No.: 3410-009.
    c. Date Filed: April 30, 2001.
    d. Applicant: Woods Lake Hydro Company.
    e. Name of Project: Woods Lake Hydro Project.
    f. Location: On Lime Creek, a tributary of Frying Pan River, in 
Eagle County, Colorado. The project occupies 2.73 acres of federal 
lands within the White River National Forest.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Kenneth M. Knight, Woods Lake Hydro Company, 
P.O. Box 11175, Aspen, Colorado (970) 925-8854.
    i. FERC Contact: Gaylord W. Hoisington, (202) 219-2756 or 
gaylord.hoisington@FERC.fed.us.
    All documents (original and eight copies) should be filed with: 
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
First Street, NE, Washington, DC 20426. Comments, protests, 
interventions and additional study requests may be filed electronically 
via the internet in lieu of papers. See, 18 CFR 385.2001(a)(1)(iii) and 
the instructions on the Commission's web site at http://
www.ferc.fed.us/efi/doorbell.htm.
    The Commission's Rules of Practice require all intervenors filing 
documents with the Commission to serve a copy of that document on each 
person on the official service list for the project. Further, if an 
intervenor files comments or documents with the Commission relating to 
the merits of an issue that may affect the responsibilities of a 
particular resource agency, they must also serve a copy of the document 
on the resource agency.
    k. This application is not ready for environmental analysis at this 
time.
    l. The existing Woods Lake Project consists of: (1) A 37.3-foot-
long, 6-foot-high overflow-type gravity dam; (2) a reservoir having a 
surface area of 0.018 acre and a storage capacity of 0.09 acre-foot of 
storage capacity; (3) a gated and screened intake structure; (4) a 
gated 15-inch 630-foot-long PVC pipeline penstock; (5) a powerhouse 
containing a generating unit having an installed capacity of 45-
kilowatts; (6) a short 24-inch-diameter CMP tailrace pipe; (7) a 1.02-
mile-long transmission line; and (8) a switch gear, power controls, 
breaker boxes switches, meters, transformers, and other appurtenant 
facilities. The applicant estimates that the total average annual 
generation would be 98,640 kilowatt-hours. All generated power is 
utilized within the applicant's existing electric utility system.
    m. A copy of the application is available for inspection and 
reproduction at the address in item h above.
    n. With this notice, we are initiating consultation with the 
Colorado State Historic Preservation Officer (SHPO), as required by 
Sec. 106, National Historic Preservation Act, and the regulations of 
the Advisory Council on Historic Preservation, 36 CFR 800.4.
    o. Procedural schedule and final amendments: The application will 
be processed according to the following milestones, some of which be 
combined to expedite processing:

Notice of application has been accepted for filing
Notice of NEPA Scoping (unless scoping has already occurred)
Notice of application is ready for environmental analysis
Notice of the availability of the draft NEPA document
Notice of the availability of the final NEPA document
Ordering issuing the Commission's decision on the application

    Final amendments to the application must be filed with the 
Commission no later than 30 days from the issuance date of the notice 
of ready for environmental analysis.

David P. Boergers,
Secretary.
[FR Doc. 01-12785 Filed 5-2-01; 8:45 am]
BILLING CODE 6717-01-M