San Luis Drainage Feature Re-evaluation
The Bureau of Reclamation is re-evaluating options for providing drainage service to the San Luis Unit of the Central Valley Project.
Proposed drainage service alternatives will be selected that maintain environmental quality and provide for continued agricultural production in a manner consistent with the Plan of Action (adobe formatted) filed April 18, 2001, in Sumner Peck Ranch, Inc., et al., v. Bureau of Reclamation, et al. A Notice of Intent to prepare an Environmental Impact Statement (EIS), pursuit to the National Environmental Policy Act, was published in the Federal Register on Tuesday, October 2, 2001.
San Luis Drainage Feature Re-evaluation Feasibility Report 7-8-08 For technical questions on the report, please contact: |
For additional information, contact William Peach, Project Manager, 916-978-5072 (TDD 916-978-5608)
Please direct comments or questions to
John Davis, Acting,, Regional Director, Mid Pacific Region.
For assistance or information about this website contact MP Region Public Affairs.
For assistance in downloading information,
please contact:
Lynnette
Wirth at 916-978-5102, lwirth@mp.usbr.gov
July 8, 2008