General Information on Projects

State
Number
PPL Agency Project Name Project
Area
AAHU Acres
Created /
Restored
Acres
Protected
Total
Net
Acres
Construction Date Status
PO-34 16 COEAlligator Bend Marsh Restoration and Shoreline Protection 584 166 285 45 330   
AT-02 2 NMFSAtchafalaya Sediment Delivery 4,248 777 2,200 32 2,232 1/25/1998Completed March 1998
TE-49 12 COEAvoca Island Diversion and Land Building 7,233 132 120 23 143  Engineering and Design
BA-38 11 NMFSBarataria Barrier Island Complex Project: Pelican Island and Pass La Mer to Chaland Pass Restoration 1,117 287 334 0 334 3/25/2006Construction
BA-27c 9 NRCSBarataria Basin Landbridge Shoreline Protection, Phase 3 2,380 101 0 264 264 10/20/2003Construction
BA-27d 11 NRCSBarataria Basin Landbridge Shoreline Protection, Phase 4 589 93 0 256 256 4/27/2005Engineering and Design
BA-27 7 NRCSBarataria Basin Landbridge Shoreline Protection, Phases 1 and 2 2,618 464 0 1,304 1,304 12/1/2000Construction
BA-26 6 NRCSBarataria Bay Waterway East Side Shoreline Protection 2,790 128 0 217 217 12/1/2000Completed June 2001
BA-23 4 NRCSBarataria Bay Waterway West Side Shoreline Protection 1,789 63 0 232 232 6/1/2000Completed Nov. 2000
BA-19 1 COEBarataria Bay Waterway Wetland Restoration 510 151 445 0 445 7/22/1996Completed Dec. 1999
PO-22 5 COEBayou Chevee Shoreline Protection 212 42 0 75 75 8/25/2001Construction
BA-48 17 NMFSBayou Dupont Ridge Creation and Marsh Restoration 317 121 187 0 187   
PO-17 1 COEBayou LaBranche Wetland Creation 487 191 203 0 203 1/6/1994Completed April 1994
BS-13 15 COEBayou Lamoque Freshwater Diversion 9,435 560 620 0 620  Engineering and Design
TV-20 13 NRCSBayou Sale Shoreline Protection 370 153 116 213 329  Engineering and Design
PO-16 1 USFWSBayou Sauvage National Wildlife Refuge Hydrologic Restoration, Phase 1 3,800 520 1,050 500 1,550 6/1/1995Completed May 1996
PO-18 2 USFWSBayou Sauvage National Wildlife Refuge Hydrologic Restoration, Phase 2 5,475 584 750 530 1,280 4/15/1996Completed May 1997
MR-13 10 COEBenneys Bay Diversion 21,518 1,426 5,426 280 5,706  Engineering and Design
AT-03 2 NMFSBig Island Mining 3,400 467 1,200 360 1,560 1/25/1998Completed Oct. 1998
LA-08 17 NMFSBio-Engineered Oyster Reef Demonstration 0 0 0 0 0   
CS-29 9 NRCSBlack Bayou Culverts Hydrologic Restoration 72,378 162 375 165 540 5/25/2005Construction completed
CS-27 6 NMFSBlack Bayou Hydrologic Restoration 25,529 2,812 2,960 634 3,594 7/1/2001Completed Dec. 2001
BS-15 17 EPABohemia Mississippi River Reintroduction 5,210 989 637 0 637   
TV-09 2 NRCSBoston Canal/Vermilion Bay Bank Protection 466 78 0 378 378 9/13/1994Completed Nov. 1995
TE-28 3 NRCSBrady Canal Hydrologic Restoration 7,653 337 0 297 297 5/1/1999Completed May 2000
CS-09 2 NRCSBrown Lake Hydrologic Restoration 2,197 2 152 10 162  Engineering and Design
BS-03a 2 NRCSCaernarvon Diversion Outfall Management 15,556 504 802 0 802 6/1/2001Complete
BS-16 17 USFWSCaernarvon Outfall Management/Lake Lery SR 16,260 302 268 384 652   
CS-17 1 USFWSCameron Creole Plugs 20,392 242 865 0 865 10/1/1996Completed Jan. 1997
ME-09 1 USFWSCameron Prairie National Wildlife Refuge Shoreline Protection 640 38 0 247 247 5/19/1994Completed Aug. 1994
CS-04a 3 NRCSCameron-Creole Maintenance 54,076 454 1,140 1,462 2,602 9/30/1997Completed July 1998
AT-04 9 NMFSCastille Pass Channel Sediment Delivery 5,368 256 577 0 577  Engineering and Design
PO-27 9 NMFSChandeleur Islands Marsh Restoration 504 194 220 0 220 6/1/2001Completed July 2001
MR-06 3 COEChannel Armor Gap Crevasse 2,097 234 611 325 936 9/22/1997Completed Dec. 1997
CS-22 2 COEClear Marais Bank Protection 4,637 909 38 1,029 1,067 8/29/1996Completed March 1997
LA-03b 11 NRCSCoastwide Nutria Control Program 46,760 2,993 0 14,963 14,963 11/20/2002Implementation
CRMS USGSCoastwide Reference Monitoring System           8/14/2003 
TV-04 3 NRCSCote Blanche Hydrologic Restoration 30,000 1,200 0 2,223 2,223 3/25/1998Completed Jan. 1999
BA-36 11 USFWSDedicated Dredging on the Barataria Basin Landbridge 504 135 242 0 242  Engineering and Design
BA-33 10 COEDelta Building Diversion at Myrtle Grove 416,563 5,797 2,675 6,216 8,891  Engineering and Design
BS-10 10 COEDelta Building Diversion North of Fort St. Phillip 2,254 157 501 0 501  Engineering and Design
BS-11 10 USFWSDelta Management at Fort St. Phillip 1,305 77 267 0 267 6/19/2006Construction
MR-09 6 NMFSDelta Wide Crevasses 5,210 927 2,298 88 2,386 6/21/1999Construction
TV-21 14 EPAEast Marsh Island Marsh Creation 362 107 169 0 169  Engineering and Design
CS-20 2 NRCSEast Mud Lake Marsh Management 8,054 487 0 1,520 1,520 10/1/1995Completed Oct. 1997
CS-32 10 USFWSEast Sabine Lake Hydrologic Restoration 6,589 219 90 135 225 12/1/2004Construction
TE-25 3 NMFSEast Timbalier Island Sediment Restoration, Phase 1 45,102 319 37 1,876 1,913 5/1/1999Completed Jan. 2000
TE-30 4 NMFSEast Timbalier Island Sediment Restoration, Phase 2 9,330 140 61 154 215 5/1/1999Completed Jan. 2000
BA-30 9 NMFSEast/West Grand Terre Islands Restoration 683 269 335 0 335  Engineering and Design
TV-18 9 NMFSFour Mile Canal Terracing and Sediment Trapping 1,214 51 133 34 167 6/10/2003Construction
ME-13 5 NRCSFreshwater Bayou Bank Stabilization 1,724 248 0 511 511 2/15/1998Completed June 1998
TV-11b 9 COEFreshwater Bayou Bank Stabilization - Belle Isle Canal to Lock 285 75 44 197 241  Engineering and Design
ME-04 2 NRCSFreshwater Bayou Wetland Protection 14,381 1,611 0 1,593 1,593 8/29/1994Completed June 1998
ME-16 9 USFWSFreshwater Introduction South of Highway 82 19,988 553 53 243 296 9/1/2005Constructed
PO-06 2 NRCSFritchie Marsh Restoration 5,924 201 0 1,040 1,040 11/1/2000Completed Feb. 2001
BA-02 1 NRCSGIWW (Gulf Intracoastal Waterway) to Clovelly Hydrologic Restoration 14,948 885 0 175 175 4/21/1997Completed Oct. 2000
CS-30 9 NRCSGIWW - Perry Ridge West Bank Stabilization 1,132 40 42 41 83 11/1/2001Construction
TE-43 10 NRCSGIWW Bank Restoration of Critical Areas in Terrebonne 3,324 183 32 334 366  Engineering and Design
PO-33 13 USFWSGoose Point/Pointe Platte Marsh Creation 1,384 297 424 12 436 4/2/2008Engineering and Design
TE-10 5 USFWSGrand Bayou Hydrologic Restoration 16,164 165 0 199 199  Construction
ME-21b 11 COEGrand Lake Shoreline Protection, O&M Only [CIAP]             
ME-21a 11 COEGrand Lake Shoreline Protection, Tebo Point 1,239 153 40 490 530  Engineering and Design
ME-19 10 USFWSGrand-White Lakes Landbridge Protection 1,530 38 52 161 213 7/10/2003Constructed
CS-21 2 NRCSHighway 384 Hydrologic Restoration 650 51 0 150 150 10/1/1999Completed Jan. 2000
CS-31 11 NRCSHolly Beach Sand Management 8,901 370 0 330 330 8/1/2002Completed August 2003
PO-24 8 NMFSHopedale Hydrologic Restoration 3,805 269 0 134 134 1/10/2004Construction
ME-11 8 NRCSHumble Canal Hydrologic Restoration 4,030 297 313 65 378 7/1/2002Completed March 2003
TE-20 1 EPAIsles Dernieres Restoration East Island 449 45 9 0 9 1/16/1998Completed June 1999
TE-24 2 EPAIsles Dernieres Restoration Trinity Island 776 120 49 60 109 1/27/1998Completed June 1999
BA-20 2 NRCSJonathan Davis Wetland Restoration 7,199 485 0 510 510 6/22/1998Construction
PO-28 9 NMFSLaBranche Wetlands Terracing, Planting, and Shoreline Protection 4,505 198 374 115 489   
PO-32 12 COELake Borgne and MRGO Shoreline Protection 465 70 17 249 266  Engineering and Design
PO-30 10 EPALake Borgne Shoreline Protection 192 61 0 165 165 8/1/2007Construction
PO-31 11 EPALake Borgne Shoreline Protection at Bayou Dupre 98 29 27 56 83  Engineering and Design
TE-26 3 NMFSLake Chapeau Sediment Input and Hydrologic Restoration, Point Au Fer Island 13,024 468 194 315 509 9/14/1998Completed May 1999
BA-42 15 USFWSLake Hermitage Marsh Creation 1,581 191 402 36 438  Engineering and Design
TV-17 8 NRCSLake Portage Land Bridge 1,496 9 5 19 24 2/15/2003Construction
BA-37 11 NMFSLittle Lake Shoreline Protection/Dedicated Dredging near Round Lake 1,373 349 409 304 713 8/4/2005Construction
ME-17 9 NRCSLittle Pecan Bayou Hydrologic Restoration 13,544 210 0 56 56  Engineering and Design
TV-12 5 NMFSLittle Vermilion Bay Sediment Trapping 964 149 390 51 441 5/10/1999Completed Aug. 1999
TE-51 16 NMFSMadison Bay Marsh Creation and Terracing 1,019 242 370 2 372  Engineering
TV-14 6 COEMarsh Island Hydrologic Restoration 6,697 452 41 367 408 7/25/2001Completed December 2001
PO-19 3 COEMississippi River Gulf Outlet (MRGO) Disposal Area Marsh Protection 855 435 0 755 755 1/25/1999Completed Jan. 1999
BA-25b 5 EPAMississippi River Reintroduction Into Bayou Lafourche 85,094 705 0 988 988  Engineering and Design
BA-34 10 EPAMississippi River Reintroduction Into Northwest Barataria Basin 5,134 781 0 941 941  Engineering and Design
BA-39 12 EPAMississippi River Sediment Delivery System - Bayou Dupont 471 159 326 0 326  Engineering and Design
MR-12 12 COEMississippi River Sediment Trap 1,920 508 1,190 0 1,190  Engineering and Design
BA-24 5 NMFSMyrtle Grove Siphon 15,894 527 0 1,119 1,119   
BA-03c 5 NRCSNaomi Outfall Management 26,603 379 0 633 633 6/1/2002Completed Aug. 2002
TE-37 9 EPANew Cut Dune and Marsh Restoration 386 43 27 75 102 10/1/2006Construction
TE-32a 6 USFWSNorth Lake Boudreaux Basin Freshwater Introduction and Hydrologic Management 9,604 900 0 416 416  Engineering and Design
TE-44 10 USFWSNorth Lake Mechant Landbridge Restoration 7,571 367 408 196 604 4/1/2003Construction
TV-13a 6 NRCSOaks/Avery Canal Hydrologic Restoration, Increment 1 3,348 192 0 160 160 4/15/1999Completed October 2002
PO-26 9 COEOpportunistic Use of the Bonnet Carre Spillway 13,583 121 0 177 177  Engineering and Design
BA-35 11 NMFSPass Chaland to Grand Bayou Pass Barrier Shoreline Restoration 596 208 253 10 263  Construction
ME-14 7 NMFSPecan Island Terracing 3,550 143 383 59 442 12/15/2002Construction
TE-34 6 NRCSPenchant Basin Natural Resources Plan, Increment 1 80,719 521 35 640 675  Engineering and Design
CS-24 4 NRCSPerry Ridge Shore Protection 5,945 624 14 1,189 1,203 12/15/1998Completed Feb. 1999
TE-22 2 NMFSPoint Au Fer Canal Plugs 5,230 158 0 375 375 10/1/1995Completed May 2000
TE-48 11 NRCSRaccoon Island Shoreline Protection/Marsh Creation 0 0 167 0 167 12/13/2005Construction
CS-23 3 USFWSReplace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island Gully 42,247 491 367 586 953 11/1/1999Completed Dec. 2001
PO-29 11 EPARiver Reintroduction into Maurepas Swamp 36,121 8,486 0 5,438 5,438  Engineering and Design
BA-40 14 NMFSRiverine Sand Mining/Scofield Island Restoration 746 229 234 0 234  Engineering and Design
ME-18 10 NMFSRockefeller Refuge Gulf Shoreline Stabilization 1,373 344 57 863 920  Engineering and Design
CS-18 1 USFWSSabine National Wildlife Refuge Erosion Protection 13,000 1,655 0 5,542 5,542 10/24/1994Completed March 1995
CS-28-1 8 COESabine Refuge Marsh Creation Cycle 1 0 0 214 0 214 8/15/2001Completed February 2002
CS-28-3 8 COESabine Refuge Marsh Creation Cycle 3 0 0 187 0 187 10/25/2006Construction
CS-28-2 8 COESabine Refuge Marsh Creation, Cycle 2 0 0 184 77 261   
CS-28-4 8 COESabine Refuge Marsh Creation, Cycle 4 0 0 163 0 163   
CS-28-5 8 COESabine Refuge Marsh Creation, Cycle 5 0 0 168 0 168   
LA-09 17 NRCSSediment Containment System for Marsh Creation Demonstration 0 0 0 0 0   
TV-15 6 NMFSSediment Trapping at "The Jaws" 2,782 754 1,837 162 1,999 7/14/2004Completed
TE-47 11 EPAShip Shoal: Whiskey West Flank Restoration 1,249 269 195 0 195  Engineering and Design
ME-20 11 USFWSSouth Grand Chenier Hydrologic Restoration 7,496 322 370 70 440  Engineering and Design
TE-39 9 NRCSSouth Lake De Cade Freshwater Introduction 6,785 102 0 201 201  Engineering and Design
ME-23 15 NMFSSouth Pecan Island Freshwater Introduction 7,005 100 0 98 98   Engineering and Design
BA-41 14 NRCSSouth Shore of The Pen Shoreline Protection and Marsh Creation 348 84 155 56 211  Engineering and Design
ME-22 12 COESouth White Lake Shoreline Protection 5,473 253 157 687 844 11/1/2005Constructed
ME-24 16 COESouthwest Louisiana Gulf Shoreline Nourishment and Protection 1,244 311 203 685 888   
MR-14 13 COESpanish Pass Diversion 1,580 79 335 98 433  Engineering and Design
CS-11b 5 NRCSSweet Lake/Willow Lake Hydrologic Restoration 5,796 261 58 189 247 11/1/1999Construction
TE-40 9 EPATimbalier Island Dune and Marsh Creation 663 124 161 112 273 6/1/2004Construction
BA-28 7 NMFSVegetative Plantings of a Dredged Material Disposal Site on Grand Terre Island 297 73 100 27 127 5/1/2001 Completed July 2001
MR-15 15 COEVenice Ponds Marsh Creation and Crevasses 1,944 153 494 17 511   Engineering and Design
TV-03 1 COEVermilion River Cutoff Bank Protection 202 23 11 54 65 1/10/1996Completed Feb. 1996
TV-19 9 COEWeeks Bay Marsh Creation and Shore Protection/Commercial Canal Freshwater Redirection 0 0 211 67 278  Engineering and Design
MR-03 1 COEWest Bay Sediment Diversion 12,910 4,912 9,831 0 9,831 9/10/2003Completed November 2003
TE-52 16 NMFSWest Belle Pass Barrier Headland Restoration 542 180 204 95 299  Engineering and Design
TE-23 2 COEWest Belle Pass Headland Restoration 2,459 216 162 312 474 2/10/1998Completed July 1998
TE-46 11 USFWSWest Lake Boudreaux Shoreline Protection and Marsh Creation 1,207 129 157 120 277 7/24/2007Construction
BA-47 17 NRCSWest Pointe a la Hache Marsh Creation 352 126 203 0 203   
BA-04c 3 NRCSWest Pointe a la Hache Outfall Management 15,755 1,652 0 646 646  Engineering and Design
TE-50 13 EPAWhiskey Island Back Barrier Marsh Creation 1,038 292 272 0 272  Engineering and Design
TE-27 3 EPAWhiskey Island Restoration 4,926 549 447 792 1,239 2/13/1998Completed June 2000
BS-12 14 NRCSWhite Ditch Resurrection and Outfall Management 8,224 107 42 147 189  Engineering and Design
Summary Acres for Approved Projects: 1,478,823 51,658 69,325 120,983   

Deauthorized Projects

State
Number
PPL Agency Project Name Project
Area
AAHU Acres
Created /
Restored
Acres
Protected
Total
Net
Acres
PO-25 8 NMFSBayou Bienvenue Pump Station Diversion and Terracing (Deauthorized) 2,661 203 415 27 442
TE-33 6 EPABayou Boeuf Pump Station (Deauthorized) 218,000 1,457 0 0 0
BA-22 4 NRCSBayou L'Ours Ridge Hydrologic Restoration (Deauthorized) 24,765 467 0 737 737
BA-21 3 NMFSBayou Perot/Bayou Rigolettes Marsh Restoration (Deauthorized) 4,255 498 0 1,065 1,065
PO-21 4 NMFSEden Isles East Marsh Restoration (Deauthorized) 2,536 1,253 1,454 0 1,454
BA-18 1 NMFSFourchon Hydrologic Restoration (Deauthorized) 2,020 644 44 106 150
BS-07 4 COEGrand Bay Crevasse (Deauthorized) 6,300 257 240 394 634
BA-29 9 EPALA Highway 1 Marsh Creation (Deauthorized) 163 86 146 0 146
TE-19 1 NMFSLower Bayou LaCache Hydrologic Restoration (Deauthorized) 4,200 134 0 86 86
TE-35 6 COEMarsh Creation East of the Atchafalaya River - Avoca Island (Deauthorized) 2,000 355 434 0 434
MR-07 3 COEPass-a-Loutre Crevasse (Deauthorized) 1,869 455 1,043 0 1,043
BS-09 8 NRCSUpper Oak River Freshwater Siphon, Phase 1 (Deauthorized) 4,618 153 270 69 339
PO-09a 3 NRCSViolet Freshwater Distribution (Deauthorized) 17,980 38 40 207 247
BS-04a 3 NRCSWhite's Ditch Outfall Management (Deauthorized) 5,249 68 0 37 37

10/7/2008 10:00:06 PM

PPL - Priority Project List

Project Area - the benefitted area as determined by the Environmental Work Group for purposes of conducting Wetland Value Assessments.

AAHU - Average Annual Habitat Units as determined by the Environmental Work Group.

Habitat Units represent a numerical combination of habitat quality (Habitat Suitability Index) and habitat quantity (acres) within a given area at a given point in time. Average Annual Habitat Units represent the average number of Habitat Units within any given year over the project life for a given area.

Acres Created/Restored - The acres of emergent marsh created or restored as a result of project implementation.

Acres Protected - The acres of emergent marsh protected from loss as a result of project implementation.

Total Net Acres - The net gain in emergent marsh as a result of project implementation as determined by the Environmental Work Group. This figure includes acres of emergent marsh protected, created, and restored as a result of project implementation.