ACCESSION #: 9709180054



SIEMENS



September 11, 1997

HDC:97:098



Document Control Desk

ATTN:  Chief, Planning, Program and Management Support Branch

U.S. Nuclear Regulatory Commission

Washington, D.C. 20555



Interim Report of Evaluation of a Deviation Pursuant to 10 CFR

21.21(a)(2)



Ref.: 1.  Letter, H. Donald Curet (SPC) to Document Control Desk,

          "Interim Report of Evaluation of a Deviation Pursuant to 10 CFR

          21.21(a)(2)," July 11, 1997.



The following two interim reports were provided to the NRC by the

reference letter pursuant to the requirements of 10 CFR 21 to submit an

interim report on issues that will not be completed within 60 days of

discovery:



97-006    "Inadequate Confirmation of 17x17 HTC Correlation to 15x15

          Design," and



97-008    "Inadequate Documentation Associated with 17x17 HTC Data

          Reduction Code (XRAD)."



The evaluations related to these two interim reports have been completed

and neither evaluation resulted in a 10 CFR 21 reportable defect.



Very truly yours,





H. Donald Curet, Manager

Product Licensing



/smg



cc:  E. Y. Wang (USNRC)

     Project No. 702





Siemens Power Corporation



Nuclear Division                   2101 Horn Rapids Road

Engineering & Manufacturing        P.O. Box 130

                                   Richland, WA 99352-0130



Tel: (509) 375-8100

Fax: (609) 375-8402





*** END OF DOCUMENT ***