skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

ACCESSION #: 9610160180

                         Information & Support Services
                         P.O.  Box 3707
                         Seattle, WA 98124-2207

October 3, 1996
G-1151-SJA-96-615

Document Control Desk
United States Nuclear Regulatory Commission
Washington, D.C.  20555

BOEING

Reference: a)  Boeing Letter G-1151-RSO-92-365 dated August 31, 1992; R.
               S. Orr to the NRC Operations Center

           b)  NRC Letter Docket No.  99901227 dated August 12, 1992; L.
               J. Norrholm to R. S. Orr; Subject: Response to 10 CFR 21
               Inquiry

Dear Sir or Madam:

In accordance with the reference correspondence and 10 CFR 21, Boeing is
sending the NRC the attached error notice(s) received from our former
software suppliers.  Because of unknown current addresses, the following
former customers were not notified:

     Reactor Controls, Inc.

     Echo Energy Consultants, Inc.

     Nuclear Applications and Systems Analysis Company (Japan)

     Nuclear Power Services

     Tenera Engineering Services

     Gibbs & Hill, Inc.

     Holtec International*_/

Error notices have been sent to our other former customers.

_________________________
*_/ Please note: GTSTRUDL Program Report Form 96.20 has been returned to
Boeing by the Post Office as undeliverable.  Our efforts to obtain a
current mailing address for Holtec International have been unsuccessful.
_________________________

Very truly yours,

Sandra J.  Andrews
Nuclear Administrator
Phone: (206) 865-6248
FAX (206) 865-4851
15004 Mail Stop: 7A-33, or
e-mail: Sandra.Andrews@PSS.Boeing.com

Enclosure(s): GTSTRUDL Program Report Form No. 96.21

Georgia Tech             Computer Aided Structural Engineering Center

                         Georgia institute of Technology
                         School of Civil & Environmental Engineering
                         Atlanta, Georgia 30332-0355
                         USA
                         404 o 894 o 2260
                         404 o 894 o 8014 FAX

September 23, 1996

Attention: Nuclear Administrator
Boeing Information & Support Services
P.O.Box 24346, M/S 7A-33
Seattle, Washington 98124-0346

RE: GT STRUDL

Dear Sir or Madam:

Enclosed please find copies of GTSTRUDL PROGRAM REPORT FORM No.  96.21
and a VENDOR ACKNOWLEDGMENT FORM.  Please sign and return the VENDOR AC-
KNOWLEDGMENT FORM to acknowledge receipt of the GTSTRUDL Program Report.

Thank you for reviewing the Program Report and for returning the
Acknowledgment Form.

Best regards,
CASE Center

Lawrence F.  Kahn
Director of Professional Services

CL/tlk
Enclosures

An Equal Education and Employment Opportunity Institution

A Unit of the University System of Georgia

                      GTSTRUDL Program Report Form

                                                  GPRF No.:

                                                      DATE:

FROM:     Computer-Aided Structural Engineering Center
          Georgia Institute of Technology
          Atlanta, Georgia 30332-0355

SEVERITY LEVEL:

X URGENT       Problem results in incorrect answers which may not be
               apparent or job aborts and cannot be recovered within the
               session or job.

_ SERIOUS      Problem results in incorrect answers which are obvious or
               problem prevents completion of a particular user's task.

_ MINOR        Problem can be worked around or problem poses high
               frustration factor.

_ INFORMATIVE  Documentation error, program usage tip, user
               inconveniences.

Date Problem Confirmed

Date Notification Sent

Computers      All

Operating System    All

Version   93.01 and later

Target Release for Correction      96.02

                                        Mgr. ASD
Signature                          Title
R & D Division

Michael H.  Swanger
Typed or Printed Name              Date of Signature

Signature                          Title
Professional Services Division

Typed or Printed Name              Date of Signature            Rev.  2.2

                      GTSTRUDL Program Report Form
                               (Continued)

                                                  GPRF No.:

                                                      DATE:

DESCRIPTION:

The LIST MAXIMUM REACTIONS command may abort or produce incorrect results
if active length and force units are specified to be other than INCHES
and POUNDS respectively.  This problem may be avoided by specifying the
UNITS INCHES POUNDS command prior to giving the LIST MAXIMUM REACTIONS
command:

               UNITS INCHES POUNDS

               LIST MAXIMUM REACTIONS ...

Applicable sections of the User's Manual:

LIST MAXIMUM REACTION Command      Section 2.1.14.4.2, Volume 1, Rev. N
Input/Output Units Specification   Section 2.1.2.6, Volume 1

                                                                Rev.  2.2

*** END OF DOCUMENT ***