LICENSEE: ILLINOIS POWER CO.                 

SITE: CLINTON 1                             EN NUMBER:33556

DOCKET: 05000461                         EVENT DATE: 01-16-98

RX TYPE: BWR                             EVENT TIME: 00:00

VENDORS: GE-6                           NOTIFY DATE: 01-16-98

EMERGENCY CLASS: N/A  REGION: 3 STATE: IL      TIME: 15:47

OPS OFFICER: BOB STRANSKY             

10 CFR SECTION: CCCC  21.21               UNSPECIFIED PARAGRAPH

UNIT  SCRAM   RX   INIT  INITIAL MODE     CURR   CURRENT MODE

      CODE   CRIT  PWR                    PWR

 1    N       N      0   COLD SHUTDOWN      0   COLD SHUTDOWN  



10 CFR PART 21 REPORT REGARDING USE OF INCORRECT CABLE RESISTANCE

IN DESIGN CALCULATIONS                                           

                                                                 

INCORRECT CABLE RESISTANCE VALUES WERE USED TO DETERMINE CABLE   

TRAY LOADING AND VOLTAGE DROP OF CABLES RATED FOR LESS THAN 5 kV.

SARGENT & LUNDY STANDARD ESA-102 DID NOT CORRECTLY REFLECT       

RESISTANCE VALUES FOR TIN-COATED COPPER CONDUCTOR CABLES USED AT 

CLINTON. (TIN-COATED CABLES HAVE A HIGHER RESISTANCE THAN        

UNCOATED COPPER CABLES.) THE LICENSEE HAS IDENTIFIED THAT        

INCORRECT RESISTANCE VALUES WERE USED IN AT LEAST FIVE ELECTRICAL

VOLTAGE CALCULATIONS FOR THE AC AND DC ELECTRICAL DISTRIBUTION   

SYSTEMS.