Log No |
Notifier |
Description |
Report Date |
Access No |
2002-01-0 |
Boeing |
GTSTRUDL rigid body incidences command |
10/31/2001 |
ml020090019 |
2002-01-1 |
Boeing |
GTSTRUDL calculate resultant command |
11/28/2001 |
ml020090080 |
2002-01-2 |
Boeing |
GTSTRUDL print member properties command |
12/20/2001 |
ml020220325 |
2002-02-0 |
U.S. Geological Survey |
dosimetry at Triga reactor |
11/21/2001 |
ml020110184 |
2002-03-0 |
ASCO Valve |
Hydramotor® actuator limit switch |
12/21/2001 |
ml020240230 |
2002-03-1 |
ASCO Valve |
Hydramotor® actuator limit switch |
01/14/2002 |
ml020420376 |
2002-04-0 |
Automatic Valve |
air operated valve leakage |
01/25/2002 |
ml021200032 |
2002-05-0 |
General Electric |
cutoff switch in AK-15, AK-25, and AKR-30S circuit breakers |
02/18/2002 |
ml020650058 |
2002-06-0 |
ABB |
weight balance on CV-2 and CV-22 relays |
03/19/2002 |
Event Notification 38781 |
2002-06-1 |
ABB |
weight balance on CV-2 and CV-22 relays |
05/08/2002 |
ml021440028 |
2002-07-0 |
General Electric |
offset in instantaneous (magnetic) trip current on certain
J-core molded case circuit breakers |
04/03/2002 |
ml020990033 |
2002-08-0 |
Wyle |
incorrect irradiation dose units in hot cell work |
04/12/2002 |
ml021060181 |
2002-08-1
|
Wyle |
incorrect irradiation dose units in hot cell work |
05/22/2002 |
ml021570176 |
2002-09-0 |
General Electric |
missing lock washer on CR105X contactors |
04/12/2002 |
ml021150567 |
2002-10-0 |
Rockwell Automation |
inadequate electric motor winding slot fill |
05/09/2002 |
ml021360406 |
2002-10-1
|
Rockwell |
inadequate electric motor winding slot fill |
05/16/2002 |
ml021790469 |
2002-10-2
|
Rockwell Automation |
inadequate electric motor winding slot fill |
06/07/2002 |
ml021830510 |
2002-11-0 |
General Electric |
undersized washer in switch plate locking mechanism
on differential pressure indicating switches |
05/10/2002 |
ml021360140 |
2002-12-0 |
ABB |
failure of K-Line circuit breakers to charge at San
Onofre |
05/14/2002 |
Event Notification 38919 |
2002-13-0 |
Solid State Controls |
potential for loose fan blade in uninterruptible power
systems |
05/15/2002 |
ml021510295 |
2002-14-0 |
Consumers Energy |
lack of quality assurance maintenance on Midland Unit
2 reactor pressure vessel head |
05/23/2002 |
ml021550411 |
2002-15-0 |
Rotork Controls |
potential for electric valve actuator control switches
to reset or fail to operate |
06/10/2002 |
ml021790313 |
2002-16-0 |
ASCO |
excessive recycling of pump needed to maintain valve
actuator shaft in powered position during testing |
06/19/2002 |
ml021830047 |
2002-16-1
|
ASCO |
excessive recycling of pump needed to maintain
valve actuator shaft in powered position during testing |
07/19/2002 |
ml022070455 |
2002-16-2
|
ASCO |
potential operational difficulties with certain pumps supplied in
pump kits and intended for installation in NH95 Model B Hydramotor®
actuators |
08/02/2002 |
ml022210232 |
2002-16-3 |
ASCO Valve Inc. |
Excessive recycling of pump needed to maintain valve actuator shaft
in powered position during testing |
12/17/2002 |
ml023600354 |
2002-17-0 |
Rosemount |
inaccurate advice to Rochester Gas and Electric concerning
calibration of Models 1152 and 1154 pressure transmitters with high
line pressure |
07/24/2002 |
Event Notification 39086 |
2002-18-0 |
Engine Systems |
EMD emergency diesel generator air start system pressure regulating
valve may stick open |
07/30/2002 |
ml022190534 |
2002-19-0 |
Engine Systems |
potential bearing cooling oil blockage from loose flashing material
used in manufacture of EMD 645 engine pistons |
08/01/2002 |
ml022200286 |
2002-20-0 |
Rockbestos |
incorrect lacquer applied to electrical cable could contribute to
flame propagation |
08/09/2002 |
ml022260608 |
2002-20-1
|
Rockbestos |
Cable failed to comely with the vertical tray flame test when subjected
to the requirements |
08/09/2002 |
ml022900277 |
2002-21-0 |
General Electric |
inadequate vibratory loads on main steam isolation valves with one
main steam isolation valve out of service |
08/23/2002 |
ml022380417 |
2002-21-1
|
General Electric |
Main Steam Line Valve Out-of-Service Final Report |
08/23/2002 |
ml022810290 |
2002-22-0
|
ABB |
test failure of a power shield trip device manufactured before March
1991 |
08/26/2002 |
ml022410017 |
2002-22-1
|
ABB |
Power Shield Transformer Saturation |
08/26/2002 |
ml022740451 |
2002-23-0
|
Rosemount |
failures of capacitors in damping circuits of certain Models 1153
and 1154 |
08/30/2002 |
ml022620057 |
2002-24-0 |
Rosemount |
certain Model 1153 differential pressure transmitters and space
sensor modules may not meet the published temperature effect specification |
09/09/2002 |
ml022620059 |
2002-25-0 |
ALCo (Fairbanks Morse) |
Fuel injector pump found to be leaking excessively through a nameplate
rivet hole |
09/18/2002 |
Event Notification 39197 |
2002-25-1
|
ALCo (Fairbanks Morse) |
Fuel injector pump found to be leaking excessively through a nameplage
rivet hole |
10/11/2002 |
ml022960351 |
2002-26-0 |
Fitzpatrick |
Trip device over current sensor failed during bench testing |
09/26/2002 |
Event Notification 39218 |
2002-26-1 |
Fitzpatrick |
Trip device over current sensor failed during bench testing |
10/02/2002 |
ml022890175 |
2002-27-0 |
General Electric |
Potentially delayed reactor scram because of the period based detection
algorithm (PBDA) |
10/04/2002 |
ml022830278 |
2002-27-1
|
General Electric |
Final Report, Stability Option III: Possible Successive COnfirmation
Count Resets |
11/18/2002 |
ml023290162 |
2002-28-0 |
General Electric |
Technical Specification safety limit for minimum critical power
ratio (MCPR) may be exceeded in BWR/6 plant using newer fuel designs |
10/04/2002 |
ml022820162 |
2002-29-0 |
C & D Technologies |
A series of welds for a fuel rack joining horizontal cross beams
were not welded correctly during fabrication and may effect seismic
qualifications |
10/11/2002 |
ml022900283 |
2002-30-0 |
Engineer Systems |
Seal within engine driven water pump assembly failed prematurely
resulting in leakage of primary cooling water and lubricating oil
from weep hole in EDG |
10/04/2002 |
ml022900613 |
2002-31-0
|
General Electric |
Stability Option III Period Based Detection Algorithm T-min Specification
Has a Defect |
11/22/2002 |
ml023310569 |
2002-32-0
|
Framatome |
The MCPR calculation using the SPCB correlation in the MICROBURN-B2
and MICROBURN-B codes and associated POWERPLEX monitoring software
contains an erroPower Shield Transformer Saturation |
11/22/2002 |
ml023310566 |
2002-33-0
|
Spectrum Technologies |
Class 1E safety related Cutler-hammer A200 NEMA Size 1 starter found
to be faulty |
11/25/2002 |
ml023330442 |
2002-33-1 |
Spectrum Technologies |
Class 1E safety related Cutler-hammer A200 NEMA Size 1 starter found
to be faulty |
12/20/2002 |
ml023600023 |
2002-35-0
|
ABB |
Broken solder joints (crack in solder joint) on some pins on the
tap blocks of Power shield trip devices |
11/20/2002 |
ml030160169 |
2002-36-0
|
Caboline |
Premature gellation or significant thickening prior to the end of
the 12-month shelf life expiration date of Carbonize 11 SG |
12/06/2002 |
ml023500215 |
2002-37-0
|
Framatome |
Location of fuel assemblies in BWR/6 reactors with the POWRPLEX
incore monitoring system may affect their orifice pressure loss coefficients |
12/10/2002 |
ml023470352 |
2002-38-0
|
Boeing Company |
Errors associated with the computer codes "ANSYS" and
"GTSTRUDL" |
11/19/2002 |
ml023360088 |