Home > Electronic Reading Room > Document Collections > Reports Associated with Events
> Power Reactor Status Reports
> 2008
> March 1
Power Reactor Status Report for March 1, 2008
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
82 |
|
REDUCED POWER FOR WATERBOX CLEANING |
* |
|
Beaver Valley 2 |
100 |
|
|
|
|
Calvert Cliffs 1 |
0 |
02/22/2008 |
REFUELING OUTAGE |
|
|
Calvert Cliffs 2 |
100 |
|
|
|
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
100 |
|
|
|
|
Indian Point 2 |
100 |
|
|
|
|
Indian Point 3 |
100 |
|
|
|
|
Limerick 1 |
0 |
02/29/2008 |
COASTDOWN TO REFUELING OUTAGE |
* |
|
Limerick 2 |
100 |
|
|
|
|
Millstone 2 |
100 |
|
|
|
|
Millstone 3 |
100 |
|
|
|
|
Nine Mile Point 1 |
100 |
|
|
|
|
Nine Mile Point 2 |
100 |
|
|
|
|
Oyster Creek |
81 |
|
TURBINE VALVE ISSUES AND FW HEATER OOS |
* |
|
Peach Bottom 2 |
100 |
|
#3 STARTUP SOURCE WILL BE OOS THRU 3/1/08. |
|
|
Peach Bottom 3 |
100 |
|
#3 STARTUP SOURCE WILL BE OOS THRU 3/1/08. |
|
|
Pilgrim 1 |
100 |
|
|
|
|
Salem 1 |
100 |
|
|
|
|
Salem 2 |
91 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Seabrook 1 |
100 |
|
|
|
|
Susquehanna 1 |
97 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Susquehanna 2 |
100 |
|
VOLTAGE REGULATOR IN MANUAL |
|
|
Three Mile Island 1 |
100 |
|
|
|
|
Vermont Yankee |
100 |
|
|
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
100 |
|
500 KV UNION LINE OOS |
|
|
Browns Ferry 2 |
100 |
|
500 KV UNION LINE OOS |
|
|
Browns Ferry 3 |
99 |
|
500 KV UNION LINE OOS
COASTDOWN TO REFUELING OUTAGE |
* |
|
Brunswick 1 |
94 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Brunswick 2 |
100 |
|
|
|
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
100 |
|
|
|
|
Crystal River 3 |
22 |
|
SCHEDULED REPAIR TO RCP |
* |
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
100 |
|
|
|
|
Harris 1 |
100 |
|
|
|
|
Hatch 1 |
0 |
02/03/2008 |
REFUELING OUTAGE |
|
|
Hatch 2 |
100 |
|
|
|
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
32 |
|
SHUTDOWN TO REFUELING OUTAGE |
* |
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
100 |
|
|
|
|
Oconee 1 |
68 |
|
1A RCP SHUT DOWN |
* |
|
Oconee 2 |
100 |
|
|
|
|
Oconee 3 |
100 |
|
|
|
|
Robinson 2 |
100 |
|
|
|
|
Saint Lucie 1 |
100 |
|
|
|
|
Saint Lucie 2 |
100 |
|
|
|
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
100 |
|
|
|
|
Surry 1 |
100 |
|
|
|
|
Surry 2 |
100 |
|
|
|
|
Turkey Point 3 |
0 |
02/26/2008 |
TRIP SEE EN #44009 |
|
|
Turkey Point 4 |
0 |
02/29/2008 |
STARTING UP AFTER TRIP. SEE EVENT 44016 |
* |
|
Vogtle 1 |
100 |
|
TG VOLTAGE REGULATOR IN MANUAL |
* |
|
Vogtle 2 |
100 |
|
|
* |
|
Watts Bar 1 |
0 |
02/10/2008 |
DEFUELED |
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
|
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
|
|
Byron 2 |
100 |
|
|
|
|
Clinton |
96 |
|
100% ELECTRICAL CAPABILITY - 345KV LINE 4545 WILL BE OOS FROM 0800 3/3 TO 1500 3/4. |
|
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
72 |
|
REDUCED FOR ROD SWAP AND RX FEEDPUMP MAINTENANCE |
* |
|
Dresden 3 |
98 |
|
100% ELECTRICAL CAPABILITY |
|
|
Duane Arnold |
97 |
|
100% ELECTRICAL CAPABILITY. |
|
|
Fermi 2 |
100 |
|
BROWNSTOWN-WAYNE 2 LINE (1 OF 3) OOS THRU 3/7 |
|
|
Kewaunee |
100 |
|
|
|
|
La Salle 1 |
16 |
|
HOLDING POWER FOR TURBINE TESTING |
|
|
La Salle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
|
|
Palisades |
100 |
|
FRONT BUS WILL BE OOS FOR MAINTENANCE ON 3/3 |
|
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
0 |
02/12/2008 |
CORE RELOAD IN PROGRESS |
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
97 |
|
100% ELECTRICAL OUTPUT |
|
|
Quad Cities 2 |
86 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
100 |
|
|
|
|
Arkansas Nuclear 2 |
100 |
|
|
|
|
Callaway |
100 |
|
|
|
|
Columbia Generating Station |
100 |
|
|
|
|
Comanche Peak 1 |
100 |
|
|
|
|
Comanche Peak 2 |
100 |
|
|
|
|
Cooper |
96 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
Diablo Canyon 1 |
100 |
|
|
|
|
Diablo Canyon 2 |
0 |
02/03/2008 |
DEFUELED |
|
|
Fort Calhoun |
100 |
|
|
|
|
Grand Gulf 1 |
82 |
|
INCREASING POWER FOLLOWING ROD PATTERN ADJUSTMENT |
* |
|
Palo Verde 1 |
100 |
|
MAINTENANCE ON THE S/U TRANSFORMER THRU 3/1 |
|
|
Palo Verde 2 |
100 |
|
MAINTENANCE ON THE S/U TRANSFORMER THRU 3/1 |
|
|
Palo Verde 3 |
100 |
|
MAINTENANCE ON THE S/U TRANSFORMER THRU 3/1 |
|
|
River Bend 1 |
0 |
01/06/2008 |
REFUELING OUTAGE - PREPARING FOR STARTUP |
* |
|
San Onofre 2 |
99 |
|
|
|
|
San Onofre 3 |
100 |
|
|
|
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
100 |
|
|
|
|
Waterford 3 |
100 |
|
|
|
|
Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|