TRAINING: |
No special training requirements have been identified for any documents issued
with this change notice. |
|
REMARKS: |
IMC 2515 (Light-Water Reactor Inspection Program - Operations
Phase) is revised to reflect the deletion of IMC 2500, "Reactor Inspection Program."
Those parts of IMC 2500 that were still applicable to the reactor operations
inspection program were transferred to IMC 2515. |
IP 92720 (Corrective Action) is revised to incorporate lessons
learned from the maintenance rule baseline inspections, and to add guidance
to verify the adequacy of corrective action programs which implement maintenance
rule requirements. |
9900 Technical Guidance - Maintenance (Preconditioning of
Structures, Systems, and Components (SSCs) Before Determining Operability) is
issued to provide guidance on evaluating the acceptability of preconditioning
of structures, systems and components (SSCs) before the performance of operability,
surveillance, or conformance testing. |
TI 2800/028 (Inspections of Strontium-90 Ophthalmic Applicators)
is issued to address health and safety concerns related to ongoing problems
with multiple patient misadministrations due to improperly calibrated Sr-90
Ophthalmic Applicators. |
DISTRIBUTION: |
Standard |
|