US-APWR Design Certification Pre-Application Review
Since July 2006, the staff of the U.S. Nuclear Regulatory Commission (NRC) and Mitsubishi Heavy Industries, Ltd. (MHI) have been engaged in a variety of pre-application review activities associated with possible certification of a standard design for the U.S. Advanced Pressurized-Water Reactor
(US-APWR). For detail, see the following topics on this page:
The following links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS). ADAMS documents are provided
in either Adobe Portable Document Format (PDF) or Tagged Image File Format
(TIFF).
To obtain free viewers for displaying these formats, see our Plugins,
Viewers, and Other Tools. If you have problems
with viewing or printing documents from ADAMS, please contact the Public
Document
Room staff.
Design Description
Public Meetings
Date |
Description |
09/26/07 |
Public Meeting on Technical Specifications for the US-APWR Four Train Systems (PAR Meeting # 10)
|
08/23/07 |
Public Meeting on Safety Features and Plant Design Features for the US-APWR (PAR Meeting # 9)
|
07/26/07 |
Public Meeting on the Severe Accident Analysis Methodologies for the US-APWR (PAR Meeting # 8)
|
06/13/07 |
Public Meeting on the Electrical System, Design Acceptance Criteria, and Technical Specifications for the US-APWR (PAR Meeting #7)
|
03/22/07 |
Public Meeting on Engineered Safety Features (ESF), Small Break Loss-of-Coolant Accident (SBLOCA), and Containment Response Analysis Methodologies for the US-APWR (PAR Meeting #6)
|
03/01/07 |
Public Meeting on Radiation Dose Assessment, Severe Accident Mitigation, and Probabilistic Risk Assessment (PRA) for the US-APWR (PAR Meeting #5)
|
02/01/07 |
Public Meeting to Discuss Mitsubishi's Loss-of-Coolant Accident (LOCA) and non-LOCA (PAR Meeting #4)
|
11/29/06 |
US-APWR Pre-Application Review Meeting: Advanced Accumulator (PAR Meeting #3)
|
11/28/06 |
Meeting with Mitsubishi Heavy Industries (MHI), Public Meeting to Discuss MHI's Proposed Quality Assurance Topical Report (PAR Meeting #3)
|
11/28/06 |
Meeting with Mitsubishi Heavy Industries (MHI), Public Meeting to Discuss MHI's Proposed Topical Report on Instrumentation and Controls (PAR Meeting #3)
|
09/26/06 |
US-APWR Pre-Application Review Meeting #2
|
07/13/06 |
US-APWR Pre-Application Review Meeting #1
|
Testing Plans
Date |
Description |
07/13/07 |
Reactor Vessel Lower Plenum 1/7 Scale Model Flow Test Plan
|
07/13/07 |
Neutron Reflector Reflooding Test Plan
|
|