Home > Nuclear Reactors > New Reactors > Combined License Applications > William States Lee III Nuclear Site, Units 1 and 2 Application
William States Lee III Nuclear Site, Units 1 and 2 Application
|
Who: |
Duke Energy
|
What: |
Application for a combined license (COL) for two Westinghouse Advance Passive 1000 (AP1000) Pressurized Water Reactors (PWRs) designated as Lee Nuclear Station Units 1 & 2
|
When: |
December 13, 2007 (date of application submittal)
|
Where: |
Duke's Lee site near Charlotte in Cherokee County, South Carolina |
|
On this page:
The following links on this page are to documents in our Agencywide
Documents Access and Management System (ADAMS). ADAMS documents are provided
in either Adobe Portable Document Format (PDF) or Tagged Image File Format
(TIFF).
To obtain free viewers for displaying these formats, see our Plugins,
Viewers, and Other Tools. If you have problems
with viewing or printing documents from ADAMS, please contact the Public
Document
Room staff.
Reference Documents
Applicant Documents
Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.
Duke transmittal letter for Lee Nuclear Station Units 1 & 2 COLA (December 12, 2007)
- Part 0 – Cover Letter, Affidavits, etc
- Part 1 – Administrative and Financial Information
- Part 2 – Final Safety Analysis Report (FSAR)
- Part 3 – Environmental Report
- Part 4 – Technical Specifications
- Part 5 – Emergency Plan
- Part 6 – [Not used. Reserved for applicants requesting Limited Work Authorization (LWA)]
- Part 7 – Departures and Exemption Requests
- Part 8 – [This Part contains safeguards information which is withheld from public availability]
- Part 9 – [This Part contains other information which is withheld from public availability]
- Part 10 – License Conditions and Inspection, Tests, Analyses and Acceptance Criteria (ITAAC)
- Part 11 – Enclosures
Application Review Schedule
Key Milestones |
Completion Date Actual - A Target - T |
Application Tendered |
12/13/07 - A |
Acceptance Review |
Acceptance Review Start |
01/02/08 - A |
Docketing Decision Letter Issued/Acceptance Review Complete |
02/25/08 - A |
Review Schedule Established/Schedule Letter Issued to Applicant |
04/02/08 - A |
Safety Review |
Phase 1 –Requests for Additional Information (RAIs) Issued to Applicant |
02/05/09 - T |
Phase 2 – SER with Open Items issued |
10/08/09 - T |
Phase 3 – ACRS Review of SER with Open Items Complete |
01/10 - T |
Phase 4 – Advanced SER with no Open Items Issued |
09/10 - T |
Phase 5 – ACRS Review of SER with no Open Items Complete |
12/10 - T |
Phase 6 – Final SER Issued |
02/11 - T |
Environmental Review |
Phase 1 – Environmental impact statement (EIS) summary report issued |
09/11/08 - A |
Phase 2 – Draft EIS issued to EPA |
03/18/09 - T |
Phase 3 – Response to public comments on draft EIS issued |
08/19/09 - T |
Phase 4 – Final EIS issued to EPA |
03/10 - T |
Hearing |
Commission or ASLB hold mandatory hearing |
|
License |
Commission decision on issuance of COL application |
|
Information on Federal Register Notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found at NRC’s Website on Hearing Opportunities.
NRC Documents
Requests for Additional Information
Category |
RAI Date |
RAI Letter No. and Subject |
Applicant Response |
Safety |
08/06/08 |
RAI Letter No. 01 SRP Section 8.2
|
|
08/11/08 |
RAI Letter No. 02 SRP Section 10.04.05
|
|
08/11/08 |
RAI Letter No. 03 SRP Section 10.04.05
|
|
08/14/08 |
RAI Letter No. 04 SRP Section 7.5
|
|
08/27/08 |
RAI Letter No. 05 SRP Section 8.2
|
|
08/18/08 |
RAI Letter No. 06 SRP Section 10.04.06
|
|
08/25/08 |
RAI Letter No. 07 SRP Section 1.9
|
|
08/28/08 |
RAI Letter No. 08 SRP Section 9.2.1
|
|
08/28/08 |
RAI Letter No. 09 SRP Section 9.5.1
|
|
09/11/08 |
RAI Letter No. 10 SRP Section 2.3
|
|
09/12/08 |
RAI Letter No. 11 SRP Section 2.3.2
|
|
09/12/08 |
RAI Letter No. 12 SRP Section 2.3.4
|
|
09/16/08 |
RAI Letter No. 13 SRP Section 11.02
|
|
09/17/08 |
RAI Letter No. 14 SRP Section 11.03
|
|
09/18/08 |
RAI Letter No. 15 SRP Section 08.02
|
|
09/19/08 |
RAI Letter No. 16 SRP Section 2.4.13
|
|
09/19/08 |
RAI Letter No. 17 SRP Section 02.04.12
|
|
09/19/08 |
RAI Letter No. 18 SRP Section 19
|
|
09/19/08 |
RAI Letter No. 19 SRP Section 6.4
|
|
09/19/08 |
RAI Letter No. 20 SRP Section 03.02.01
|
|
09/19/08 |
RAI Letter No. 21 SRP Section 09.05.02
|
|
09/19/08 |
RAI Letter No. 22 SRP Section 09.02.01
|
|
09/19/08 |
RAI Letter No. 23 SRP Section 02.03.01
|
|
Environmental |
08/21/08 |
RAI Letter Regarding the Environmental Review of the Combined License Application
|
|
Public Meetings
Date |
Description |
05/01/08 |
Scoping Meeting
|
03/19/08 |
Duke Energy Lee Combined License Schedule Discussion
|
08/30/07 |
Public Outreach
|
Contacts
Contacts for the William States Lee III Nuclear Site COL Application |
Safety Project Manager |
Brian Hughes |
Environmental Project Manager |
Linda Tello |
Contact a Public Affairs Officer |
|