skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
Combined License Applications for New Reactors
Bellefonte Units 3 & 4
Callaway Unit 2
Calvert Cliffs Unit 3
Comanche Peak Units 3 & 4
Fermi Unit 3
Grand Gulf Unit 3
Levy County Units 1 & 2
North Anna Unit 3
River Bend Station Unit 3
Shearon Harris Units 2 & 3
South Texas Project Units 3 & 4
Victoria County Station Units 1 & 2
Virgil C. Summer Units 2 & 3
Vogtle Units 3 & 4
William States Lee III Units 1 & 2

Grand Gulf, Unit 3 Application

Grand Gulf
Who:   Entergy Operations, Inc. (EOI) [see Part 1 for additional details]

What:   Application for a combined license (COL) for an Economic Simplified Boiling Water Reactor (ESBWR) designated as Grand Gulf Unit 3

When:   February 27, 2008 (date of application submittal)

Where:   EOI's Grand Gulf site near Port Gibson in Claiborne County, Mississippi

On this page:

The following links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS). ADAMS documents are provided in either Adobe Portable Document Format (PDF) or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools. If you have problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Reference Documents

To top of page

Applicant Documents

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Design Control Documents would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Grand Gulf 3 COLA

  • Part 1 – General and Administrative Information
  • Part 2 – Final Safety Analysis Report (FSAR)
  • Part 3 – Environmental Report
  • Part 4 – Technical Specifications
  • Part 5 – Emergency Plan
  • Part 6 - LWA/Site Redness Plan
  • Part 7 – Departures (Variances, Supplemental Information) from the ESBWR Design Control Document (DCD)
  • Part 8 – Security Plan [This Part contains safeguards information which is withheld from public availability]
  • Part 9 – Withheld information [This part contains sensitive information which is withheld from public availability]
  • Part 10 – Tier 1/Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC)
  • Part 11 – Enclosures [QA Plan, Environmental Protection Plan]

To top of page

Application Review Schedule

Key Milestones Completion Date
Actual - A
Target - T
Application Tendered 02/27/08 - A
Acceptance Review
Acceptance Review Start
03/03/08 - A
Docketing Decision Letter Issued/Acceptance Review Complete
04/17/08 - A
Review Schedule Established/Schedule Letter Issued to Applicant
05/16/08 - A
Safety Review
Phase 1 –Requests for Additional Information (RAIs) Issued to Applicant
01/23/09 - T
Phase 2 – SER with Open Items issued
09/04/09 - T
Phase 3 – ACRS Review of SER with Open Items Complete
12/09 - T
Phase 4 – Advanced SER with no Open Items Issued
09/10 - T
Phase 5 – ACRS Review of SER with no Open Items Complete
01/11 - T
Phase 6 – Final SER Issued
03/11 - T
Environmental Review
Phase 1 – Environmental impact statement (EIS) summary report issued
12/19/08 - T
Phase 2 – Draft EIS issued to EPA
05/19/09 - T
Phase 3 – Response to public comments on draft EIS issued
11/03/09 - T
Phase 4 – Final EIS issued to EPA
05/10 - T
Hearing
Commission or ASLB hold mandatory hearing
 
License
Commission decision on issuance of COL application
 

Information on Federal Register Notices for receipt of the application and opportunity to request a hearing or petition to intervene can be found at NRC’s Website on Hearing Opportunities.

To top of page

NRC Documents

To top of page

Requests for Additional Information

Category RAI Date RAI Letter No. and Subject Applicant Response
Safety 09/05/08 RAI Letter No. 01 SRP Section 19  
09/12/08 RAI Letter No. 02 SRP Section 2.31, 2.3.4 and 2.3.5  
09/12/08 RAI Letter No. 03 SRP Section 12.03-12.04  
09/16/08 RAI Letter No. 04 SRP Section 13.01.02-13.01.03  
09/18/08 RAI Letter No. 05 SRP Section 17.5  
09/18/08 RAI Letter No. 06 SRP Section 10.04.05  
Environmental 09/08/08 Request for Additional Information Regarding the Environmental Review of the Combined License Application for Grand Gulf Nuclear Station, Unit 3  

To top of page

Public Meetings

Date Description
06/19/08 Public Scoping Meeting
03/19/08 Meeting regarding the technical content of the Grand Gulf Unit 3 COLA
03/06/08 Grand Gulf Unit 3 COLA Orientation
02/21/08 Public Outreach Meeting

To top of page

Contacts

Contacts for the Grand Gulf COL Application
Safety Project Manager Eric Oesterle
Mark Tonacci
Environmental Project Manager Tamsen Dozier
Contact a Public Affairs Officer

To top of page



Privacy Policy | Site Disclaimer