Date |
Description |
5/1/08-5/2/08 |
Category 2 Meeting - Meeting Between The Nuclear Regulatory Commission (NRC) Staff, Industry Representatives, And Electric Power Research Institute/Materials Reliability Project Representatives On Alloy 690/52/152 Research And Areas Of Possible Collaboration.
Contact: Samantha Crane, 301-415-6380
|
9/25/2007 - 9/26/2007 |
Category 2 Meeting - Meeting between the Nuclear Regulatory Commission
Staff, Argonne National Laboratory Staff and Industry Representatives on
Program Plans for Environmentally Assisted Cracking of Light Water Reactor
Structural Materials.
Contact: Samantha Crane, 301-415-6380
|
05/30/2007 |
Category 2 Meeting - Meeting between the Nuclear Regulatory Commission Staff, EPRI/MRP, utility representatives and vendors updating research results on the mitigation of primary water stress corrosion cracking of nickel-base alloys.
Contact: Samantha Crane, 301-415-6380
|
12/20/2006 |
Category 2 Meeting - Meeting with Nuclear Energy Institute (NEI) regarding implications of Wolf Creek dissimilar metal weld inspections.
|
11/16/2006 |
Category 2 Meeting - Meeting with Nuclear Energy Institute (NEI) regarding implications of dissimilar metal weld inspection results at Wolf Creek.
|
10/25/2006 |
Category 2 Meeting - Meeting between the Nuclear Regulatory Commission Staff,
Nuclear Energy Institute and other industry representatives on inspection program
for primary system piping butt welds (MRP-139).
|
10/24/2006 |
Category 2 Meeting - Review of NRC and EPRI/MRP coordination of nickel-base alloy programs in the areas of stress analysis and non-destructive examination of reactor components.
Contact: William Cullen, 301-415-7510
|
05/05/2006 |
Category 2 Meeting - Meeting between the Nuclear Regulatory Commission Staff,
Nuclear Energy Institute and other industry to discuss responses to NRC comments
on MRP-139 guidance document.
|
08/25/2005 |
Category 2 Meeting - Meeting between the Nuclear Regulatory
Commission Staff, EPRI/MRP, and Southern Nuclear Operating Company
and Westinghouse on Mitigation of Primary Water Stress Corrosion
Cracking.
|
08/04/2005 |
Category 2 Meeting - Meeting between the Nuclear Regulatory Commission Staff,
Nuclear Energy Institute, and other industry to discuss butt weld inspection and
evaluation guidelines.
|
03/24/2005 |
Category 2 Meeting - Meeting between the Nuclear Regulatory Commission Staff
and the Nuclear Energy Institute on the alloy 600 management and Materials Reliability
Program MRP-139.
|
03/16/2005 |
Pre-emptive weld overlays (PWOLS) for alloy 82/182 Butt welds in PWR’s topical report
Kickoff meeting.
|
07/08/2004 |
Category 2 Meeting - Meeting between the Nuclear Regulatory Commission
Staff and the Nuclear Energy Institue on the status of the Alloy
600 butt weld safety assessment.
Contact: Joe Birmingham, 301-415-2829
|
04/16/2004 |
Category 2 Meeting – Meeting between Nuclear Regulatory Commission (NRC) staff,
and representatives of the Nuclear Energy Institute, the Electrical Power Research
Institute (EPRI) Materials Reliability Program (MRP) and industry on butt weld safety
assessment.
|
06/12/2003 |
Category 2 Meeting - NRC and Nuclear Energy Institute
(NEI) - Discuss materials issues related to South Texas Project
vessel residue, butt weld safety assessment, RPV safety assessment,
BAC program, and North Anna head study.
Contact: Joe Birmingham, 301-415-2829
|
01/18/2001 |
Public meeting with V.C. Summer to discuss
hot leg weld crack root cause analysis, corrective actions, and
readiness for restart.
|
01/04/2001 |
(Meeting Rescheduled 1/18/01)
|
12/20/2000 |
Public meeting with V. C. Summer to discuss the
laboratory analysis results for the flawed weld.
|
11/21/2000 |
Meeting with South Carolina Electric & Gas on
the V. C. Summer Nuclear Station reactor coolant system hot leg
weld crack
|
10/25/2000 |
Public meeting between the NRC and
South Carolina Electric & Gas Company to discuss planned activities
concerning evaluating and repairing the crack in RCS hot leg weld.
|